My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Technical Assistance for 2022 DSSMR South Bend Dam Proj No. 122-019 – Christopher B. Burke Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Technical Assistance for 2022 DSSMR South Bend Dam Proj No. 122-019 – Christopher B. Burke Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:20:53 AM
Creation date
12/15/2021 8:20:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2022 South Bend Dam Technical Assistance December 1, 2021 <br />Attachment A Page 1 <br />Christopher B. Burke Engineering, LLC <br />220 West Colfax Avenue Suite 500 South Bend, IN 46601 574.282.8001 cbbel-in.com <br />ATTACHMENT A <br />The South Bend Dam (License No. 7569) is a low-head, run-of-the-river dam on the St. Joseph River near <br />downtown South Bend. The Federal Energy Regulatory Commission (FERC) requires that a Dam Safety <br />Surveillance and Monitoring Report (DSSMR) be completed annually to review instrumentation and <br />monitoring data to determine if potential failure modes are developing. It is our understanding that the City of <br />South Bend (City) is interested in having Burke complete the 2021 DSSMR (covering the 2021 calendar year) <br />and other tasks related to ongoing FERC compliance in 2022. <br />The scope of work will include the following tasks: <br />Task 1 – 2021 DSSMR Report: Burke will review pertinent information regarding the dam necessary to <br />complete the DSSMR which may include previous DSSMR reports and other information contained in either <br />the City’s or IDNR’s file for the dam. It is expected that the City will provide the data from the last year for <br />the two staff gages located along the East Race. <br />Burke will prepare a brief written DSSMR in accordance with FERC guidance outlined in Chapter 14 of <br />Engineering Guidelines for the Evaluation of Hydropower Projects. The report will be completed based on Burke’s <br />observations in 2021. The level of detail and content of the report is expected to be similar to the 2020 DSSMR <br />prepared by Burke. We will submit the report to the City in draft format before finalizing. It is expected that <br />the University of Notre Dame (license exemption holder) or its consultants will file the report with FERC. <br />Task 2 – 2022 Annual Inspection: In preparation for the 2022 DSSMR and to fulfill the annual visual <br />inspection requirement, a Burke registered professional engineer will perform visual observations of safely- <br />accessible portions of the dam and appurtenant structures. Since the South Bend Dam is an in-channel <br />structure, much of the dam and its appurtenances are not readily accessible for visual observation. Burke’s <br />observations will be focused on potential dam safety concerns to determine if the dam appears safe for <br />continued operation. This scope of work specifically excludes preparation of the 2022 DSSMR report. It is <br />expected that the annual inspection will occur on the same date as the gate operation certification. <br />Task 3 – Update DSSMP: Burke will update the Dam Safety Surveillance and Monitoring Plan (DSSMP) for <br />the South Bend Dam as needed based on comments received from FERC and changes that may have occurred <br />since the last revision. We will submit the updated DSSMP to the City in draft format before finalizing. It is <br />expected that the University of Notre Dame or its consultants will file the report with FERC concurrently with <br />the 2021 DSSMR. <br />Task 4 – Gate Operation Certification: The Spillway Gate Operation Certificate must be completed each <br />year. Burke staff will observe operation of the three East Race gates by City staff and will assist in preparation <br />of the certificate to submit to FERC. Burke will prepare a cover letter to accompany the certificate and will <br />send to the University of Notre Dame or its consultants for submittal to FERC.
The URL can be used to link to this page
Your browser does not support the video tag.