My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emergency Sewer Repair - 18” Sewer at Dubail Ave. under Bowman Creek – Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Emergency Sewer Repair - 18” Sewer at Dubail Ave. under Bowman Creek – Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:19:40 AM
Creation date
12/15/2021 8:19:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S:\Public Works\Projects\Projects by Year\2021 Projects\121-060 Dubail Sewer and Structure Emergency Repairs\1 - Admin\1 - BPW <br />Documents\20211123_121-060 Emergency Sewer Repair Dubail and Bowman Creek_Memo to BPW.doc Page 4 <br />7.8/24/21: CIPP liner cut out of <br />manhole @ Indiana; the impression <br />on the back of the liner are brick, <br />this gives an idea of how large the <br />liner is that was removed by IPR <br />Contractor estimated the work to be $50,000 to 100,000, accessing Bowman Creek, performing <br />sewer repair at sinkhole and bypassing Bowman Creek above grade; any additional work <br />including open cut of the street would be on the higher end of the estimate range. The final cost <br />of the work was $38,969.85 out of the following account 641-06-602-509-439001. The estimate <br />was not exceeded as a point repair was possible within the structure and bypass within the <br />creek and around the sinkhole was possible. The Selge Crew mobilized quickly and executed <br />the plan very well. Job well done. <br />Separately, the Engineering Team is working with IPR to resolve the failed liner and impacts <br />from the failed liner such as sewer cleaning, sewer backups, and this sewer failure. <br />December 14, 2021
The URL can be used to link to this page
Your browser does not support the video tag.