Laserfiche WebLink
290 3 <br />>tember 12th,. 1905. <br />SPECIAL SESSION TUESDAY EVENING`SEPTE BER,12Th, 1905 AT 7:15 P. M. <br />The Board met in Special Session at 7:15 P. M. All members present. <br />Hearing given on Declaratory Resolutions for the following improvements; <br />Brick "Pavement : oh the alleyt%�;d joining' -No.. 2._ - Hose I Mouse Brick Pavement <br />on Tutt street From Lafayette street to the tracks of the Chicago & South Bend R..R.,. <br />Grade, Curb & Walk on William street from Washington street to Colfax avenue, <br />Grade, Curb & Walk on Harper Court from Vistula avenue to River avenue, Grade, Curb <br />& Walk on River avenue for its full length North`&.South from Harper Court, Grade, <br />Curb bn7-;Notre Dame street from the Grand Trunk to proposed.Boulevard. All under <br />Improvement Resolutions Nos.; ', 285, 2562 2972269, 299 & 290 respectively. <br />In the above matter no remonstrators appeared and no remonstrances were filed. <br />The Board therefore find in each and every case in said improvements that the benefits <br />to the property and.to the City of South Bend are equal to the estimated cost of <br />said improvements and the same.are hereby in all things ratified, confirmed and <br />approved. <br />Engineer filed estimated cost of the improvements as follows; <br />NO. 2 Hose House Alley Brick pavement $ 995.00 <br />Tutt street Frick pavement. 4 200.00 <br />William street Grade, Curb & Walk 600.00 <br />Harper Court Do. 451.00 <br />River avenue Do. 672.00 <br />Notre Dame street Grade & Curb 565.00 <br />Clerk was instructed to advertise for bids for the Pipe Sewer on Oak street. <br />Be it resolved that notices be published in the South Bend Daily Times on the <br />13th day of September and on the 20th day of September, 1905, to the effect that <br />this Board will receive bids for said improvements up to 10 A. M. on the 26th day <br />of September, 1905, The Board reserves the right to reject any or all bids. <br />Hearing on Assessment Rolls and final estimates for Pipe Sewer on St. Louis <br />street and Brick Pavement on E. Colfax avenue, deferred until Friday September 15th <br />1905, at 10 A. M. <br />Remonstrance filed against the NO. 2 Hose House Ailey Pavement. <br />Hearing given on Assessment Rolls and final estimates for the following <br />improvements; <br />Grade, Curb & Walk on Witwer avenue from Dayton street to the alley <br />South of Calvert street, Pipe Sewer on W. Tutt street from Prairie avenue to the end <br />of Brick Sewer in Tutt street, Cement sidewalk on Florence avenue from Wilber street <br />to Johnson street All under Improvement Resolutions Nos. 256, 273 & 266 respectively <br />A1soWater connections on Portage avenue from Forest avenue to I. I. & I. viaduct. <br />No remonstrators appeared and no remonstrances were filed. The Board <br />therefore find that the property assessed in said rolls filed August 22nd, 1905, <br />and the final estimate allowed August 22nd, 1905, should be and the same is hereby <br />in all things ratified, Confirmed and approved. <br />/ �-�_ I A rz �' , r e A e A w <br />