My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Permit - Honeywell International Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Permit - Honeywell International Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:32:58 AM
Creation date
10/27/2021 9:32:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Recommendations
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />29 <br />Honeywell International Industrial Discharge Permit <br />c. If the permittee is a Federal, State, or local government facility: A director <br />or highest official appointed or designated to oversee the operation and <br />performance of the activities of the government facility, or their designee. <br /> <br />ii. The individuals described in paragraphs (a) through (c) above, may designate a <br />Duly Authorized Representative if the authorization is made in writing by the <br />individual described in (a) through (c) above, the authorization specifies either an <br />individual or a position having responsibility for the overall operation of the facility <br />from which the Industrial Discharge originates, such as the position of plant <br />manager, operator of a well, or well field superintendant, or a position of equivalent <br />responsibility, or having overall responsibility for environmental matters for the <br />company, and the written authorization is submitted to the Director. <br />iii. Should the permittee wish to change the Authorized Representative responsible to <br />receive correspondence from the Control Authority a written designation must be <br />submitted to the Control Authority indicating the name of the new Authorized <br />Representative designated to receive compliance correspondence, their position in the <br />company, a statement that they meet the requirements in Part IV (B) (15) of this permit, <br />complete contact information, and an effective date of this designation. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.