My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:22:45 AM
Creation date
10/27/2021 9:22:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />Exhibit C – Compensation Packet RPR-1: Resident Project Representative Services – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />COMPENSATION PACKET RPR-1: <br />Resident Project Representative – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />C2.04 Compensation for Resident Project Representative Basic Services – Lump Sum Method of <br />Payment <br />A.Owner shall pay Engineer for Resident Project Representative Basic Services as follows: <br />1.Resident Project Representative Services: For services of Engineer’s Resident Project <br />Representative, if any, under Paragraph A1.05 of Exhibit A, the Lump Sum amount of <br />TBD. The Lump Sum includes compensation for the Resident Project Representative’s <br />services, and for the services of any direct assistants to the Resident Project Representative. <br />Appropriate amounts have been incorporated in the Lump Sum to account for labor, <br />overhead, profit, and Reimbursable Expenses related to the Resident Project <br />Representative’s Services. <br />2.Resident Project Representative Schedule: The Lump Sum amount set forth in Paragraph <br />C2.04.A.1 above is based on full-time RPR services on an eight-hour workday Monday <br />through Friday over a construction schedule to be determined. Modifications to the <br />schedule shall entitle Engineer to an equitable adjustment of compensation for RPR <br />services. <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881
The URL can be used to link to this page
Your browser does not support the video tag.