My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Study Phase to Design Wastewater Treatment Plant CSO Storage Tank - American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:22:45 AM
Creation date
10/27/2021 9:22:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />B.Period of Service: The compensation amount stipulated in Compensation Packet BC-1 is <br />conditioned on a period of service not exceeding 18 months. If such period of service is extended, <br />the compensation amount for Engineer's services shall be appropriately adjusted. <br />1.Professional services hourly billing rates, mileage rates, and consumables costs are subject <br />to annual adjustment on January 1st of every calendar year during the duration of the project. <br />Cost adjustments will be handled through approved Amendments to the Contract. <br />DocuSign Envelope ID: 1C4AA711-DA0B-418C-90FE-56D629C93881
The URL can be used to link to this page
Your browser does not support the video tag.