Laserfiche WebLink
<br />3 of 3 Appendix “A” <br /> <br />B. Services resulting from significant changes in the general scope, extent or character of the <br />Project or its design including, but not limited to, changes in size, complexity, OWNER's <br />schedule, character of construction or method of financing; and revising previously accepted <br />studies, reports, design documents or Contract Documents when such revisions are required by <br />changes in laws, rules, regulations, ordinances, codes or orders enacted subsequent to the <br />preparation of such studies, reports, or documents, or are due to any other causes beyond <br />ENGINEER's control, shall require a change in work as provided by Section VI - General <br />Provisions, Paragraph 12 titled "Changes in Work". <br /> <br /> <br /> <br /> <br />(The remainder of this page intentionally left blank)