Laserfiche WebLink
121-029 - Morris Performing Arts Center Page 7 of 9 <br />Frost Engineering & Consulting Company OUR MISSION IS SIMPLE <br />© Copyright 2005. All rights reserved. BE THE BEST! <br />6.Meetings not outlined above. <br />7.Cost engineering, if required, following results of the bid openings. <br />Submittal of Bidding and Construction Plans and Documents shall be under seal of an <br />Indiana Professional Engineer. <br />PALAIS ROYALE ATTIC CATWALK LOAD RATING <br />Services will include: <br />1.Study and Report Phase <br />a.Review of provided existing building documents <br />b.Maximum of o ne site visit with two structural engineers from FEC to be <br />coordinated with the Palais Royale O perations Team to confirm the <br />current and intended use of the catwalk and perform a detailed <br />inspection of the frame to confirm me mber sizing matches that shown <br />on the provided existing plans. <br />c.Deliverables include an Executive Summary detailing the results of the <br />structural assessment including the determined load rating of the <br />catwalk. <br />Services exclude the following: <br />1.Lateral load capacity analysis of the existing roof structure. <br />2.Analysis will be limited to confirming adequate strength of the frame providing direct <br />support to the catwalk including the roof joists and roof girders only. <br />3.Analysis of the structure should it significantly vary from that which is shown on the <br />existing building documents. <br />4.Submission of a calculations package <br />5.Meetings not outlined above. <br />Submittal of the Executive summary detailing the load rating results shall be under seal <br />of an Indiana Professional Engineer. <br />$19,400.00 <br />Quotation prepared by : Richard M. Estes, PE <br />This quotation is subject to the conditions noted on the following pages: <br />To accept this quotation, sign here and return: ______________________________________________________ <br />THANK YOU FOR YOUR BUSINESS !