My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Resolutions
>
Resolution No 36-2021 - Adopting Revised Construction Standards and Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2021 9:20:49 AM
Creation date
10/27/2021 9:19:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Resolutions
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 1 – GENERAL MISCELLANEOUS <br />6 <br />All topography, planimetric information, infrastructure, and structures (e.g. manholes, catch basins, <br />inlets, and outfalls) shall also be located by Indiana State Plane: East Zone (NAD83) coordinates. <br />Appropriate equipment and methods of location shall be performed by trained personnel to assure <br />the acceptable relative positional accuracy specified in this standard is met. All coordinate values <br />shall be presented to the nearest hundredth with a relative positional accuracy of 0.25 <br />feet. Coordinate information shall include ties to two known control monuments. Location of <br />manholes shall be at the center of the manhole; casting locations for catch basins shall be at the <br />flowline. <br />1-11 PRIVATE IMPROVEMENTS <br />This Section outlines the proper procedure for approval, construction, dedication, and acceptance of <br />storm sewers, sanitary sewers, roads, curbs, sidewalks, drainage, and other related improvements <br />constructed by Developers for dedication to the Civil City of South Bend as Public Right-of-Way. <br />The Developer shall meet with the City to discuss the project and to develop an agreement specifying <br />the Developer’s plan to address the items noted in this Section and other potential concerns from <br />the City. This meeting shall be conducted prior to final plan and specification development as well <br />as prior to the process described below. <br />1-11.1 PRIVATE IMPROVEMENTS IN UNDEDICATED AREAS <br />1-11.1 (a) INITIAL APPROVAL <br />1.The Developer must submit to the Board of Public Works , acting through the Department of <br />Engineering, all final plans and specifications related to the proposed Improvements. <br />2.All plans shall be prepared and sealed by a Professional Engineer registered in the State of <br />Indiana. <br />3.Accompanying these documents and request for approval, the Developer shall furnish to the <br />Board of Public Works, acting through the Department of Engineering, proof of p reliminary <br />plat approval as issued by the appropriate agency. <br />4.Construction activities shall not begin unless all plans, specifications, and related documents <br />are approved by the Board of Public Works, acting through the Department of Engineering. <br />Any work completed prior to approval by the Board of Public Works, acting through the <br />Department of Engineering, may be required to be removed and replaced at the Board's or its <br />authorized representative's discretion. <br />5.If the work is not accepted or replaced by the Developer, the surety held by the Board will be <br />used to have the improvements re-installed by a licensed and bonded contractor. <br />6.Surety shall be posted in perpetuity until the acceptance of the Completion Affidavit, <br />Maintenance Bond, and Waiver of Lien. <br />7.Surety may be reduced as improvements are accepted by the Board of Public Works. <br />Reductions in surety must be submitted to the Division of Engineering for review. <br />1-11.1 (b) CONSTRUCTION PHASE <br />1.Control of Work: All work shall be done in accordance with these Special Provisions and the <br />Prevailing Specifications. <br />2.Notification to Engineers: It shall be the responsibility of the Contractor to notify the Engineer <br />of their intent to commence working operations. Said notice shall be issued no less than two
The URL can be used to link to this page
Your browser does not support the video tag.