Laserfiche WebLink
<br />Version 08/25/2021 Page - 6 Public Works Quote <br />larger utility vehicles utilize the north access drive for chemical and product deliveries. Access to <br />the north access drive shall not be impeded during scheduled deliveries. Care shall be taken to <br />restrict and protect excavations where delivery access is necessary for operational needs. <br /> <br />XVIII. DESCRIPTION OF WORK <br /> <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to demolish concrete sidewalk and curb, masonry repairs, excavation and pipe <br />embedment, concrete curb, and concrete sidewalk restoration within the City of South Bend. <br />The North Pumping Station project site is located at 830 North Michigan Street, South Bend, <br />Indiana 46601. <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br /> <br />XIX. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br /> <br />1. The plans consist of 2 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br />XX. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br /> <br />B. Additions: <br /> <br />1. The M/WBE Goals for this Project are <br />a. MBE 0.71 %. <br />b. WBE 2.81 %. <br /> <br />2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br /> <br />3. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith <br />Efforts and submit with Bid Proposal. <br /> <br />4. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid <br />Proposal. <br /> <br />XXI. SPECIAL NOTES & REQUIREMENTS <br /> <br />A. Ongoing Operations Within Project Limits <br />The Contractor shall not impede, interrupt or hinder the operation of existing water <br />treatment/distribution operations at the project site without prior written consent from the Owner. The <br />Contractor shall be responsible to provide sufficient dust/debris control measures, shoring assemblies, <br />and safety barricades to ensure repair efforts do not impede the continual operation of the facility. <br /> <br />B. INDOT Standard Drawings and Specifications <br />The following specifications are for this particular project. If any one, or several, of these conflict with <br />the current INDOT Standard Specifications and current INDOT Standard Drawings, the Project