Laserfiche WebLink
Page 4 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />E.Engineer will then meet with the Owner staff in Workshop #2, at which time the Modeling <br />Technical Memorandum will be reviewed and discussed. If it is determined that the modeling <br />resulted in satisfactory information to fully development of the new booster station design, the <br />project shall continue in accordance with this Scope of Services. However, if it is determined that <br />additional modeling is required, the Engineer and the Owner will determine additional modeling <br />requirements and agree upon an updated project scope, compensation, and schedule. <br />Within 14 calendar days of Workshop #2, Engineer will provide the Owner and its team members <br />a PDF copy of the meeting minutes, for review and comment. <br />F.Following Workshop #2, Engineer will proceed with the development of the draft Procurement <br />Documents for the Owner’s use in procuring a new packaged booster station. At the same time, <br />Engineer will also complete the preliminary Project Design (30%), which will include the site <br />improvements associated with the new booster pumping station. Engineer will also perform initial <br />utility coordination at this time. In addition, an opinion of the probable construction cost will be <br />prepared based on the preliminary design documents. <br />Engineer will provide the Owner with three (3) hard copies and one electronic (PDF) copy of the <br />draft Procurement Documents and the preliminary Project Design (30%) plus the preliminary <br />opinion of the probable construction cost for their review. <br />G.Engineer and the Owner will meet for Workshop #3, at which time they will review and discuss <br />the draft Procurement Documents and the preliminary design (30%). <br />Within 14 calendar days of Workshop #3, Engineer will provide the Owner and its team members <br />a PDF copy of the meeting minutes, for review and comment. <br />H.Following Workshop #3, Engineer will finalize the Procurement Documents for the packaged <br />booster pumping station and assist the Owner with Procurement Services. As part of these <br />services, Engineer will coordinate with the selected package booster pumping station <br />manufacturer to identify the specific details required to complete the Project Design bid <br />documents. <br />I.In conjunction with the Procurement Services, Engineer will complete the final review Project <br />Design bid documents (95%) and update the opinion of the probable construction cost. <br />Engineer will provide the Owner with three (3) hard copies and one electronic (PDF) copy of the <br />final review Project Design (95%) bid documents and probable construction cost for their review. <br />J.Engineer and the Owner will meet for Workshop #4, at which time they will review and discuss <br />the final review Project Design (95%) bid documents. <br />Within 14 calendar days of Workshop #4, Engineer will provide the Owner and its team members <br />a PDF copy of the meeting minutes, for review and comment. <br />K.Following Workshop #4, Engineer will finalize the Project Design bid documents for IDEM <br />construction permit application. Engineer will coordinate with IDEM and the Owner regarding