My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Discharge Permit Renewal - Honeywell International, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Licenses & Permits
>
Industrial Wastewater Discharge Permit Renewal - Honeywell International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 3:20:00 PM
Creation date
9/14/2021 3:19:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Recommendations
Document Date
9/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Honeywell Groundwater Remediation Industrial Wastewater Discharge Permit page 3 of 39 <br />PART II - MONITORING REQUIRMENTS <br />Monitoring Frequency <br />1.The following parameters shall be monitored at the frequency and with the sampling type stated <br />below. All measurements, tests, and analyses of the characteristics of water and wastes to which <br />reference is made in this permit shall be conducted using the methods and procedures approved <br />in 40 CFR 136 and amendments thereto, unless otherwise specified in an applicable Categorical <br />Pretreatment Standard. <br />The following parameters shall be monitored at sample sites EW-1-R, EW-2, EW-3, EW-5-R, E3A, RWB16, and <br />RWB23 with the methods and at the frequency stated below: <br />Parameter Sampling Frequency Sampling Type <br />Flow, Monthly (gal) Monthly Continuously <br />B-TEX (ug/L)SemiAnnual Grab <br />Total Oil and Grease (mg/L) SemiAnnual Grab <br />Oil and Grease TPH (mg/L) SemiAnnual Grab <br />pH (SU) SemiAnnual Grab <br />Ammonia, nitrogen (mg/L) Once per First Year of Permit Cycle* Composite <br />Arsenic (mg/L) Once per First Year of Permit Cycle* Composite <br />BOD5 (mg/L) Once per First Year of Permit Cycle* Composite <br />Cadmium (mg/L) Once per First Year of Permit Cycle* Composite <br />Chromium (mg/L) Once per First Year of Permit Cycle* Composite <br />Closed Cup Flashpoint (Degrees F) Once per First Year of Permit Cycle* Grab <br />Copper (mg/L) Once per First Year of Permit Cycle* Composite <br />Cyanide (mg/L) Once per First Year of Permit Cycle* Grab <br />Lead (mg/L) Once per First Year of Permit Cycle* Composite <br />Mercury (mg/L) Once per First Year of Permit Cycle* Grab <br />Nickel (mg/L) Once per First Year of Permit Cycle* Composite <br />Organic Priority Pollutants (ug/L) Once per First Year of Permit Cycle* Grab <br />Phosphorus (mg/L) Once per First Year of Permit Cycle* Composite <br />Silver (mg/L) Once per First Year of Permit Cycle* Composite <br />TSS (mg/L) Once per First Year of Permit Cycle* Composite <br />Zinc (mg/L) Once per First Year of Permit Cycle* Composite <br />See Flow Measurement Requirements referenced in Part III - Reporting Requirements. <br />*Once per First Year Permit Cycle: Parameters with this requirement must be monitored within the first year (12 <br />months) of each permit cycle. Please see Board of Public Works signature page for dates of permit term.
The URL can be used to link to this page
Your browser does not support the video tag.