Laserfiche WebLink
TEAM PROJECT APPROACH RELEVANT EXPERIENCE 6HWC ENGINEERING | CITY OF SOUTH BEND: INSPECTION OF OLIVE STREET PHASE 2 FIRM OVERVIEW <br />PRE-CONSTRUCTION <br />MAY 2022 <br />FINAL RECORDS <br />WINTER 2022-2023 <br />CONSTRUCTION <br />SUMMER/FALL 2022 <br />BID <br />MARCH 2022 <br />INSPECTION OF OLIVE STREET PHASE 2 ROAD IMPROVEMENTS AT RAILROAD CROSSING <br />(DES # 1902178) LAPORTE DISTRICT <br />PROJECT <br />UNDERSTANDING <br />This project includes construction of a three-lane <br />road with a 10’ multi-use path which crosses a set of <br />existing railroad tracks. The section of roadway being <br />constructed is on Olive Street at the Norfolk Southern <br />Railroad Crossing located between Tucker Drive and <br />Indiana Court. The project is located in South Bend, IN. <br />As shown on previous pages, Mr. Holth has inspected <br />a variety of projects including both roadway <br />reconstruction and trail/path projects. He has also <br />overseen reconstruction of a prior section of Olive <br />Street so he is well versed with this roadway segment <br />and any potential issues that may arise in this area. <br />This previous knowledge will help HWC streamline any <br />field issues for Phase II construction. His prior career as <br />a contractor also provides him a better understanding <br />of the entirety of the project including how each <br />component is constructed. <br />Mr. Holth has become a recognizable and trusted <br />partner to the City of South Bend. He understands and <br />strives to exceed the expectations that your City sets <br />forth and is prepared to grow his successful resume of <br />work in South Bend. <br />PROJECT APPROACH <br />HWC’s project approach is focused on continuing to grow the confidence the City of South Bend has in <br />our firm by assigning a familiar and proven Project Supervisor, Chris Holth. The level of accomplishment <br />and success of not just our firm, but also of Mr. Holth, will help to execute this project on time, on <br />budget, and always with the safety of the traveling public in mind. Mr. Holth prides himself on a high <br />level of attention to detail and derives from his past construction experience an unmatched level of <br />understanding of each aspect of a construction project. <br />Each project has its unique components but HWC has a step above the competition with an inspection <br />team with experience in not only construction inspection, but also with team members certified in <br />both utility and railroad coordination. With this project directly affected by a railroad crossing, this <br />certification and expertise will bring added value to our inspection team for this project. Our team also <br />possesses knowledge and course certifications in stormwater level 1 and 2, maintenance of traffic, <br />OSHA 10 and 30 hour, multiple asphalt courses, and is both equipped and well versed in all testing <br />methods applicable to this type of project. <br />Mr. Holth specifically has managed almost all of his resume of work within the LaPorte District and <br />has developed a powerful working relationship with this entity that is continually strengthened by his <br />exemplary performance. HWC builds on this level of trust and familiarity to assure that Mr. Holth will <br />continue to oversee that projects are constructed in a manner that yields a quality, lasting product.