Laserfiche WebLink
<br />Page 34 of 42 <br />3. Routine inspection card present <br />4. Signal plan sheet and cabinet print present <br />5. Certification date sticker on malfunction management unit (“MMU”) needs <br />to be within 15 months; if MMU is out of date at the time of inspection, new <br />MMU shall be installed <br />6. Field wires and detector lead-ins tagged <br /> 7. Signal Support Structures: <br />□ Plumb or slightly raked <br />□ Good physical condition <br />□ Check for need of painting <br />□ External conduit mounted securely, if present <br />8. Detection and Signs: <br />□ Check condition of detection on all approaches, look for condition indicative of upcoming failure <br /> □ Signal Related Signs - check to see if all required signs are in proper position and in satisfactory condition <br />9. Special Markings: <br /> □ Condition of stop bars <br /> □ Condition of cross walks <br /> <br />Comments (Issues that need addressed): <br />