Laserfiche WebLink
<br />Page 31 of 42 <br />EXHIBIT B <br /> <br /> <br />UNIT RATES <br /> <br /> <br />I. Non-Scheduled Maintenance: <br />A. Actuated Signal $89.07/ Intersection <br />B. Flasher $29.39/ Intersection <br />C. Locate Intersection $156.97/ Intersection <br />D. Install controller cabinet $553.26/ Each <br />E. Pole, Span, Catenary or Tether, Replace $750.00/ Each <br />F. Loop Testing $176.48/ Each <br /> <br />II. Scheduled Preventative Maintenance: <br />A. Actuated Signal $115.79/ Intersection <br />B. Flasher $57.89/ Intersection <br />C. LED Upgrade $23.24/ Indication <br /> <br />