Laserfiche WebLink
<br />Page 32 of 42 <br />EXHIBIT C <br />SIGNAL PREVENTATIVE MAINTENANCE CHECKLIST <br />1. Signal Indications: <br />□ All lights operating and in proper sequence <br />2. Signal Heads: <br />□ Proper height (visual check) <br />□ Proper alignment: Horizontal, vertical, and rotation, check aiming of program heads. <br />□ No visors missing, broken, or missing <br />□ Check for missing pinnacles <br />□ Visibility, sight distance correct <br />3. Overhead Spans, Cables, and Signs: <br />□ Proper spacing of cable rings <br />□ Tether broken, loose, missing <br />□ Sagging or loose spans or “A” wires <br />□ Check to ensure all signs are installed and in satisfactory condition <br />4. Service Disconnect Box: <br />□ Box and Conduit mounted securely <br />□ All connections snug <br />□ Ground wire secured to pole <br />□ Ground rod clamp snug – if possible <br />□ Proper voltage - summer months only <br />□ Door closes securely <br />□ Lock on securely, lubricate lock <br />□ General inspection for condition; missing covers, etc.