Laserfiche WebLink
REGULAR MEETING <br />DECEMBER 20 2012 410 <br />APPROVAL OF LONG -TERM OCCUPANCY PERMIT — SOUTH BEND HERITAGE <br />FOUNDATION <br />Mr. Tony Molnar, Engineering, advised that the Board is in receipt of a Long -Term Occupancy <br />Permit application from South Bend. Heritage Foundation for occupancy of the sidewalk and <br />parking spaces in front of the Rushton Building, 501 West Washington Street for the purpose of <br />through 2013 <br />Funds (CDBG) <br />Amendment <br />Near Northwest <br />Community Space — <br />$123,513.00 <br />Gilot /Inks <br />Neighborhood <br />Extend 2010 Program <br />No Additional <br />through 2013 <br />Funds (CDBG) <br />Amendment <br />Near Northwest <br />Neighborhood <br />$276,487.00 <br />Gilot /Inks <br />Neighborhood <br />Revitalization — Extend <br />No Additional <br />2011 Program through <br />Funds (CDBG) <br />2013 <br />Amendment <br />Redevelopment <br />Main Street /Lafayette <br />(SSDA TIF) <br />Inks /Mecha <br />to the <br />Commission <br />Boulevard Connector <br />Addendum <br />Design <br />to the <br />Master <br />Agency <br />Agreement <br />Supplement <br />No. 7 <br />Professional <br />Lawson- Fisher <br />Main Street /Lafayette <br />$147,000.00 <br />Inks/Neal <br />Services <br />Associates <br />Boulevard Connector <br />(SSDA TIF) <br />Supplement <br />Additional Design — <br />al <br />Project No. 110 -058A <br />Agreement <br />No. 4 <br />Professional <br />Force 5 Media <br />Website Redesign — <br />$1,000.00 <br />Mecham /Inks <br />Services <br />Security and <br />Agreement <br />Administration <br />Implementation <br />Contract <br />PerkinElmer <br />Two -Year Service Plan <br />$23,616.00 <br />Mecham/Inks <br />Health Sciences, <br />for ICP, Chiller and <br />Inc. <br />Autosampler Used for <br />Wastewater and Drinking <br />Water Analysis <br />Addendum <br />Redevelopment <br />Ignition Park Phase 1 B <br />AEDA TIF <br />Inks /Mecham <br />to the <br />Commission <br />Rough Grading — Project <br />Master <br />No. 112 -072 <br />Agency <br />Agreement <br />2013 <br />Redevelopment <br />Commission Designating <br />N/A <br />Mecham/Neal <br />Master <br />Commission <br />the Board of Public Works <br />Agency <br />as It's Agent to Undertake <br />Agreement <br />Various Projects in 2613 <br />(Projects to be Added by <br />Addendum) <br />Insurance <br />Gibson <br />Risk Advisory Services <br />$79,500.00 <br />Gilot/Inks <br />Services <br />Insurance <br />($30,000 <br />Authorize <br />Agreement <br />Agency, Inc. <br />Property <br />Controller to <br />Insurance; <br />Sign any End of <br />$25,500 <br />Year Insurance <br />Worker's <br />or Benefit <br />Compensation; <br />Agreements <br />$24,000 Loss <br />Needing <br />Contract <br />INDOT <br />Phase III, North <br />Prevention) <br />$597,000.00 <br />Processing <br />Inks /Mecham <br />Connection and Local <br />(Major Moves) <br />Subject to <br />Street Work of the US 31 <br />Receipt of Final <br />Utility Relocation <br />Document <br />APPROVAL OF LONG -TERM OCCUPANCY PERMIT — SOUTH BEND HERITAGE <br />FOUNDATION <br />Mr. Tony Molnar, Engineering, advised that the Board is in receipt of a Long -Term Occupancy <br />Permit application from South Bend. Heritage Foundation for occupancy of the sidewalk and <br />parking spaces in front of the Rushton Building, 501 West Washington Street for the purpose of <br />