My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 2:49:37 PM
Creation date
7/27/2021 2:49:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/27/2021
Text box
ID:
1
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:lbiek@southbendin.gov
ID:
2
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:cholth@hwcengineering.com
ID:
3
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:tvilla@southbendin.gov
ID:
4
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:nrelias@milestonelp.com
ID:
5
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:jday@hwcengineering.com
ID:
6
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:mwhitten@usiconsultants.com
ID:
7
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:SHauersperger@indot.IN.gov
ID:
8
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:kboyles@southbendin.gov
ID:
9
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:kboyles@southbendin.gov
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Leslie Biek <br />To:Chris Holth; Toy Villa; Relias, Nick <br />Cc:Jonathan Day; mwhitten@usiconsultants.com; Hauersperger, Steven; Kara Boyles <br />Subject:RE: 2" Copper and 6" Fire protection <br />Date:Thursday, April 22, 2021 12:09:11 PM <br />Nick and Chris, <br />We have gotten the go-ahead from Eric. Please proceed with the work. The City will work directly <br />with Milestone to get the work accomplished this Saturday. <br /> <br />Thanks! <br />Leslie Biek, P.E. <br />Assistant City EngineerDivision of Engineering <br />City of South Bend <br />lbiek@southbendin.gov <br /> <br />From: Chris Holth <cholth@hwcengineering.com> <br />Sent: Wednesday, April 21, 2021 11:10 AM <br />To: Leslie Biek <lbiek@southbendin.gov>; Toy Villa <tvilla@southbendin.gov>; Hauersperger, Steven <br /><SHauersperger@indot.IN.gov> <br />Cc: Jonathan Day <jday@hwcengineering.com>; mwhitten@usiconsultants.com; Relias, Nick <br /><nrelias@milestonelp.com> <br />Subject: FW: 2" Copper and 6" Fire protection <br /> <br />All, <br /> <br />Looking for a quick verbal on this pricing and work so that Milestone can get this accomplished this <br />Saturday. I have been going through the INDOT CO price range summary to determine if Milestones <br />prices are within past approved projects. Based on this information I think that they are well within <br />and lower on both these items from other approved CO for this type of work. <br /> <br />For the 2” re-route a line stop alone has been priced at $9000.00 not including the pipe re-routing <br />and labor to install the rest of the 2” copper. So I would recommend this price for sure. <br /> <br />For the 6” ductile Iron re-connect for fire protection there is no specific price for this found, but a <br />standard 6” re-connect is priced about average at $500.00 a lft or a basic reconnection listed at <br />$5500.00 which is just tying on to an existing service, which at approx. 30’ that would be well above <br />the price requested without the add’l fire protection manpower and Saturday work. <br /> <br />This one is critical to get a verbal on so Milestone can get them here Saturday. I won’t write a formal <br />CO until I get a verbal back from South Bend and INDOT, but at least with an agreement to the price <br />we can proceed and not hold up storm placement heading North. Let us know your thoughts. <br /> <br />Thanks, <br />Chris Holth
The URL can be used to link to this page
Your browser does not support the video tag.