Laserfiche WebLink
From:Leslie Biek <br />To:Chris Holth; Toy Villa; Relias, Nick <br />Cc:Jonathan Day; mwhitten@usiconsultants.com; Hauersperger, Steven; Kara Boyles <br />Subject:RE: 2" Copper and 6" Fire protection <br />Date:Thursday, April 22, 2021 12:09:11 PM <br />Nick and Chris, <br />We have gotten the go-ahead from Eric. Please proceed with the work. The City will work directly <br />with Milestone to get the work accomplished this Saturday. <br /> <br />Thanks! <br />Leslie Biek, P.E. <br />Assistant City EngineerDivision of Engineering <br />City of South Bend <br />lbiek@southbendin.gov <br /> <br />From: Chris Holth <cholth@hwcengineering.com> <br />Sent: Wednesday, April 21, 2021 11:10 AM <br />To: Leslie Biek <lbiek@southbendin.gov>; Toy Villa <tvilla@southbendin.gov>; Hauersperger, Steven <br /><SHauersperger@indot.IN.gov> <br />Cc: Jonathan Day <jday@hwcengineering.com>; mwhitten@usiconsultants.com; Relias, Nick <br /><nrelias@milestonelp.com> <br />Subject: FW: 2" Copper and 6" Fire protection <br /> <br />All, <br /> <br />Looking for a quick verbal on this pricing and work so that Milestone can get this accomplished this <br />Saturday. I have been going through the INDOT CO price range summary to determine if Milestones <br />prices are within past approved projects. Based on this information I think that they are well within <br />and lower on both these items from other approved CO for this type of work. <br /> <br />For the 2” re-route a line stop alone has been priced at $9000.00 not including the pipe re-routing <br />and labor to install the rest of the 2” copper. So I would recommend this price for sure. <br /> <br />For the 6” ductile Iron re-connect for fire protection there is no specific price for this found, but a <br />standard 6” re-connect is priced about average at $500.00 a lft or a basic reconnection listed at <br />$5500.00 which is just tying on to an existing service, which at approx. 30’ that would be well above <br />the price requested without the add’l fire protection manpower and Saturday work. <br /> <br />This one is critical to get a verbal on so Milestone can get them here Saturday. I won’t write a formal <br />CO until I get a verbal back from South Bend and INDOT, but at least with an agreement to the price <br />we can proceed and not hold up storm placement heading North. Let us know your thoughts. <br /> <br />Thanks, <br />Chris Holth