My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Award Contract - Relocation of Two (2) Water Service Lines Olive St., Phase I, Proj No 114-064 – Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 2:49:37 PM
Creation date
7/27/2021 2:49:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/27/2021
Text box
ID:
1
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:nrelias@milestonelp.com
ID:
2
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:cholth@hwcengineering.com
ID:
3
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:scansb@walshkelly.com
ID:
4
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:scansb@walshkelly.com
ID:
5
Creator:
Created:
7/27/2021 2:49 PM
Modified:
7/27/2021 2:49 PM
Text:
mailto:nrelias@milestonelp.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HWC Engineering <br /> <br /> <br /> <br /> <br /> <br />From: Relias, Nick <nrelias@milestonelp.com> <br />Sent: Wednesday, April 21, 2021 9:35 AM <br />To: Chris Holth <cholth@hwcengineering.com> <br />Subject: 2" Copper and 6" Fire protection <br /> <br />Chris, <br />Here are the prices to reroute the 6” Fire protection and the 2” Copper. This work has to be done <br />on a Saturday as we need to shutoff water to the business. It is a daycare and they are not open on <br />Saturdays. The Price for the 6” includes a Fire Protection company to shut off the system, watch the <br />building during our work and return the system to operation. The 2” requires a line stop as no one <br />will freeze this size line. I have reached out to 10 different companies and finally found one from <br />Illinois that will do the work. <br /> <br />From: scansb@walshkelly.com <scansb@walshkelly.com> <br />Sent: Wednesday, April 21, 2021 9:55 AM <br />To: Relias, Nick <nrelias@milestonelp.com> <br />Subject: Message from KM_C658 <br /> <br /> <br />Nick Relias <br />General Superintendent <br />24358 SR 23 <br />South Bend, IN 46614 <br />Office:+1-574-544-5520 <br />Mobile:+1-574-532-9056
The URL can be used to link to this page
Your browser does not support the video tag.