K:\Wbgm\Appendices for Geo. Rpts\Qualifications Apendix\Genqualw.doc  <br />09/30/15 9:35 AM  <br />STANDARD CLAUSE FOR UNANTICIPATED SUBSURFACE CONDITIONS  <br />The owner has had a subsurface exploration performed by a Geotechnical consultant, the  <br />results of which are contained in the consultant’s report.  The consultant’s report presents his  <br />conclusions on the subsurface conditions based on his interpretation of the data obtained in  <br />the exploration.  The contractor acknowledges that he has reviewed the consultant’s report and  <br />any addenda thereto, and that his bid for earthwork operations is based on the subsurface  <br />conditions as described in that report.  It is recognized that a subsurface exploration may not  <br />disclose all conditions as they actually exist and further, conditions may change, particularly  <br />groundwater conditions, between the time of a subsurface exploration and the time of  <br />earthwork operations.  In recognition of these facts, this clause is entered in the contract to  <br />provide a means of equitable additional compensation for the contractor if adverse  <br />unanticipated conditions are encountered and to provide a means of rebate to the owner if the  <br />conditions are more favorable than anticipated.  <br />Should the contractor encounter conditions that are different than those anticipated by the  <br />Geotechnical consultant’s report at any time during construction operations, he shall  <br />immediately (within 24 hours) bring this fact to the owner’s attention.  If the owner’s  <br />representative on the construction site observes subsurface conditions which are different than  <br />those anticipated by the consultant’s report, he shall immediately (within 24 hours) bring this  <br />fact to the contractor’s attention.  Once a fact of unanticipated conditions has been brought to  <br />the attention of either the owner or the contractor, and the consultant has concurred,  <br />immediate negotiations will be undertaken between the owner and the contractor to arrive at  <br />a change in contract price for additional work or reduction in work.  The contractor agrees that  <br />the following unit prices would apply for additional or reduced work under the contract.  For  <br />changed conditions in which unit prices are not provided, the additional work shall be paid for  <br />on a time and material basis.