Laserfiche WebLink
K:\Wbgm\Appendices for Geo. Rpts\Qualifications Apendix\Genqualw.doc  <br />09/30/15 9:35 AM  <br />GENERAL QUALIFICATIONS  <br />This report has been prepared at the request of our client for his use on this project.  The work,  <br />including the field work, laboratory testing, and engineering analysis, was performed in  <br />accordance with generally accepted Geotechnical Engineering practices.  For this study, we  <br />were not retained to address environmental or land use restriction concerns.  This warranty is  <br />in lieu of all other warranties either expressed or implied.  <br />This report may not contain sufficient information for purposes of other parties or other uses.   <br />Should there be any sufficient differences in structural arrangement, loading or location of the  <br />structure, our analysis should be reviewed.  <br />The analysis, conclusions, and recommendations contained in our report are based on site  <br />conditions as they existed at the time of our exploration and further assume that the borings  <br />are representative of the subsurface conditions throughout the site.  <br />If during construction, different subsurface conditions from those encountered during our  <br />exploration are observed or appear to be present beneath excavations, we must be advised  <br />promptly so that we can review these conditions and reconsider our recommendations where  <br />necessary.  <br />If there is a substantial lapse of time between the submission of our report and the start of  <br />work at the site, or if conditions have changed due to natural causes or construction operations  <br />at or adjacent to the site, we urge that our report be reviewed to determine the applicability of  <br />the conclusions and recommendations considering the changed conditions and time lapse.  <br />We urge that we be retained to review those portions of the plans and specifications that  <br />pertain to earthwork and foundations to determine whether they are consistent with our  <br />recommendations.  In addition, we are available to observe construction, particularly the  <br />compaction of structural backfill and preparation of the foundations, and such other field  <br />observations as may be necessary.  <br />In order to fairly consider changed or unexpected conditions that might arise during  <br />construction, we recommend the following verbiage to be included in the project contract.