My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 4:32:41 PM
Creation date
7/13/2021 4:31:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 2/14/2020 Page - 17 Public Works Quote <br />14. The Contractor shall place the filter bags in a location where it can be removed efficiently without <br />causing damage or losing sediment but no closer than 20 feet from the edge of pavement along <br />Auten Road. <br />15. Filter bags are to be replaced when they become laden with sediment, or exhibit leakage or other <br />failure. <br />16. The Owner has performed geotechnical soil borings within the general vicinity of the Project for <br />purposes other than the current work. <br />17. Any geotechnical soil boring results provided on the Plans, and the associated geotechnical <br />report, are provided to the Contractor for information only as a general indication groundwater <br />levels at those boring locations and the types of soils anticipated to be encountered in the area <br />during Construction Dewatering activities. <br />18. It is anticipated that a gravity pump system will be installed by the Contractor. Other pumping <br />configurations, such as a wellpoint system, are allowed on the project. The Contractor is notified <br />that the soil boring logs indicate the presence of silt and clay layers at depths that might impact <br />the design and implementation of the dewatering system. <br />19. The Contractor is encouraged to perform independent field investigations of the existing <br />conditions at the pond area to assess the method and level of effort associated with Construction <br />Dewatering prior to providing a quote or bid. The Contractor shall coordinate with the Owner to <br />access the existing pond area if such independent field investigations are desired. <br />20. Payment will be made under: <br />Pay Item Pay Unit <br />Construction Dewatering LS <br />
The URL can be used to link to this page
Your browser does not support the video tag.