Laserfiche WebLink
<br />Version 2/14/2020 Page - 16 Public Works Quote <br />reporting information shall be included in the cost of Sewer Televising and no additional <br />compensation will be allowed. <br />b. Payment will be made under: <br />Pay Item Pay Unit <br />Clean Storm Sewer, 12”-24” Dia LFT <br />Televise Storm Sewer, 12”-24” Dia LFT <br /> <br />XXXI. CONSTRUCTION DEWATERING <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. The work consists of providing all labor, equipment, including pumps, and materials necessary to <br />dewater the site to maintain suitable working conditions. <br />2. The Contractor shall design, install, and maintain a construction dewatering system with <br />adequate pumping capacity to lower and maintain a maximum free water surface elevation of <br />693.0 ft across the existing fenced pond area, on the same vertical datum benchmarks shown on <br />the Plans. This measurement shall be the standard measurement for suitable Construction <br />Dewatering conditions at the existing detention pond area. <br />3. The equipment used to dewater the pond area shall include the use of a movable dam <br />downstream of the existing detention pond and shall be constructed in such a way that a portion <br />of the dam may be collapsed at any time during the cleaning operation to protect against flooding <br />of the sewer. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, <br />special precautions to prevent flooding of the sewers and public or private property shall be <br />taken. The use of a suitable temporary dam within the storm sewer downstream of the existing <br />pond is intended to prevent backflow of groundwater and Kiefer Ditch into the pond area during <br />dewatering operations. <br />4. Construction dewatering measures shall be in place and active during all sewer cleaning and <br />video operations, and during all earthwork operations within the existing pond area. <br />5. Adequate construction dewatering operations shall be in place during the project punch list <br />walkthrough with the Owner. <br />6. By submitting a Bid/Quote, the Contractor is certifying that high groundwater elevations, on the <br />order of elevation 695.0 feet, are an anticipated component of the project which have been <br />considered in the Construction Dewatering component of the Bid/Quote. As shown on the Plans, <br />this groundwater elevation may be above the crown of certain pipes within the Work area and <br />above the ground surface within the existing fenced pond area. <br />7. All work required for maintaining the project work site in suitable working conditions is included in <br />this Pay Item. <br />8. Dewatering measures for pipe cleaning operations, such as removal of water and debris from <br />storm lines is to be included in this Pay Item. <br />9. The acceptable outlet for the Construction Dewatering process from the pond is shown on the <br />Plans. The outlet for temporary pipe dewatering operations is the back to the pond or directly to a <br />vacuum truck operated by the Contractor. <br />10. The dewatering Plan to be submitted by the Contractor shall include and indicate the use of water <br />filtering and stabilized outlets as part of this Pay Item. Direct release of dewatering discharge <br />lines without the use of a filter is prohibited. <br />11. Release of discharge from the Construction Dewatering process at the acceptable outlet shall be <br />accomplished by the Contractor at a rate that limits erosion by the use of a stabilized outlet, such <br />as temporary rock filter berm downstream of the filter bags. <br />12. The Contractor shall construct a rock filter berm near the outlet, as a secondary containment Best <br />Management Practice. The approximate height of the rock filter berm shall be approximately <br />one-foot high by four feet wide by 20 feet long. <br />13. Filter bags shall be placed on a relatively flat surface behind/upstream of the secondary <br />containment BMP.