My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - Laurel Woods Drainage Improvements Proj No. 121-007 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 4:32:41 PM
Creation date
7/13/2021 4:31:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 2/14/2020 Page - 11 Public Works Quote <br />XXVII. FENCES <br /> <br />A. Prevailing Specifications: 603 <br />B. Additions: <br /> <br />1. This Pay Item shall include all labor and materials to remove portions of existing chain link fence <br />section and posts to provide access to existing pond area to be excavated and the resetting and <br />restoration of the fence along the current alignment. <br />2. Existing fence section is approximately six-foot of chain link fabric, with three additional strands of <br />barbed wire above the fabric. <br />3. Replacement fabric and posts shall match the existing fence material as close as practical. <br />Barbed wire sections removed for project access shall be neatly terminated at the nearest <br />existing post outside of the limits to be reset and not replaced within the limits of fence to be <br />reset. <br />4. Payment will be made under: <br /> <br />Pay Item Pay Unit <br />Fence, Chain Link, Reset LFT <br /> <br />XXVIII. SEEDING <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 621, 914.01, 914.03, 914.04 <br />B. Additions: <br /> <br />1. Fertilizer shall be applied at a rate of 800 pounds per acre. Fertilizer shall not be paid for <br />separately, but shall be considered incidental to the seeding operations on the Project. <br />2. Permanent seeding shall be INDOT seed mixture, Type U. <br />3. Topsoil shall be placed below the areas to be seeded and shall consist of natural loam, sandy <br />loam, silty loam, silty clay loam, or clay loam humus-bearing soils adapted to the sustenance of <br />plant life and such topsoil shall be neither excessively acidic nor excessively alkaline in <br />accordance with INDOT Standard Specification 914.01. Topsoil shall be screened such that 100 <br />percent of the topsoil passes the one 1” sieve and 95 percent passes the No. 10 (2.00 mm) sieve. <br />Topsoil shall be a minimum of 6” deep. Topsoil shall not be compacted by heavy equipment. <br />4. Topsoil obtained from within the limits of construction shall not be paid for directly but shall be <br />considered incidental to the project. Topsoil obtained from outside the project limits which has <br />been tested and documented shall be paid for on a volumetric basis. <br />5. Payment will be made under: <br /> <br />Pay Item Pay Unit <br />Permanent Seeding, Type U SYS <br />Topsoil CYS <br /> <br />XXIX. CASTING REPLACEMENT <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 720 <br />B. Additions: <br /> <br />1. This Pay Item shall include the removal and disposal of existing castings shown on the Plans to <br />be replaced, as well as the materials and labor for the new replacement casting. <br />2. Identifying marks were not observed on the existing casting. The approximate equivalent grate <br />casting may be R-2561-A, by Neenah Foundry. <br />3. The Contractor shall verify the dimensions of the existing casting prior to removal, ordering or <br />fabrication of the replacement casting. The new casting shall be of equal or greater materials <br />than the existing casting and shall be of the same existing dimensions confirmed by the <br />Contractor. <br />4. The Contractor shall submit a Shop Drawing of the proposed replacement casting for the project. <br />5. The Owner does not object to the reuse of the existing frame, if a suitable replacement grate can <br />be utilized that conforms to the dimensions of the existing frame. Otherwise, the Contractor shall
The URL can be used to link to this page
Your browser does not support the video tag.