Laserfiche WebLink
123 <br />REGULAR MEETING JUNE 22, 2021 <br />The Regular Meeting of the Board of Public Works wits convened at 9:32 a.m. on Tuesday, June <br />22, 2021, by Board President F.lirabeth A. Maradik. The meeting; was streamed live to the public <br />with Board President Fliiabeth A. Maradik and Board Members Gary Gilot, Jordan Gathers, <br />Joseph Molnar, and Murray Miller present. Clerk Anne Fuchs confirmed the presence of the <br />members and Board Attorney Clara McDaniels with a roll call. Ms. Maradik reminded virtual <br />attendees to use the 'Teams Live Q&A feature and to please include their name for the record. <br />APPROVE MINUTES OF PRI?ViOUS MEETING <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the <br />minutes of the Regular Meeting of the Board held on June 8, 2021, were approved. <br />OPENING OF BIDS -- MAYFLOWE'R ROAD AND SAMPLE' TRAFFIC IMPROVEMENTS — <br />PROJECT NO. 120-052R (PR-00009454) <br />This was the date set fir receiving and opening of scaled bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend 'Tribune, which was found <br />to be sufiicicnt. '1'1 C 1611Owing bids were: opened and publicly read: <br />MILESTONE CONTRACTORS NOW11.11. INC, <br />24358 State Road 23 <br />South Bend, iN 46614 <br />akrt.rcgcr(rt)im1c,;toncll►.ci►nr <br />Bid was signed by Mr. Dustin I filar.y <br />Non -Collusion, Non -Discrimination Affidavit Form wits Completed. <br />Five percent (5%) Bid Bond was submitted. <br />Form MWBE -2.0 Evidence of Good Faith Efforts was completed. <br />BASE BID TOTAL..: $347,636.15 <br />RIETI-1-111LEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />gard(u),ricth riley.com <br />Bid was signed by Mr. Ruben Alvarado <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Form MWIII'-2.0 Evidence of'Good Faith Fflorts wits completed. <br />BASE BID TOTAL: $357,688.50 <br />Upon a motion made by Mr. Molnar, seconded by Mr. Oathcrs and carried by roll call, the above <br />bids were referred to Enginecring►, for review and recommendation. <br />AWARD BID AND APPROVE CONTRACT -- ROADWAY RECONSTRUCTION — <br />13ROJECT NO. 121-008 (PR-00009131) <br />Ms. Leslie Bick, Engineering;, advised the Board that on June 8, 2021, bids were received and <br />opened for the above referenced project. After reviewing those bids, Ms. Bick recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Rieth-Riley <br />Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in the amount of <br />$1,997,416.06. Therefore, Mr. Molnar made a motion that the recommendation be accepted, and <br />the bid be awarded, and the contract approved as outlined above. Mr. Gathers seconded the <br />motion, which carried by roll call. <br />AWARD BID AND APPROVE CONTRACT— 2021 CONTRACTOR PAVING ROUND II — <br />PROJECT NO. 121-031 (PR-00009186) <br />Ms. Leslic Biek, Engincering, advised the Board that on ,tune 8, 2021, bids were received and <br />opened for the above referenced project. Alter reviewing those bids, Ms. Bick recommended that <br />the Board award the contract to the lowest responsive and responsible bidder, Rieth-Riley <br />Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, in the amount of <br />$1,150,184.60. Therelore, Mr. Molnar made it motion that the recommendation be accepted, and <br />the bid be awarded, and the contract approved as outlined above. Mr. Gathers seconded the <br />motion, which carried by roll call. <br />