Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Mayflower Road and Sample Street Traffic Improvements <br />Project Number: <br />For Bids Due: <br />120-052R <br />June 22, 2021 <br />Contractor Name: Rieth-Riley Construction Co., Inc <br />23. <br />Thermal Detection System <br />1 <br />EACH <br />$3,200.00 <br />$3,200.00 <br />24. <br />Thermal Detection Camera <br />4 <br />EACH <br />$8,000.00 <br />$32,000.00 <br />25. <br />Strain Pole, Foundation <br />4 <br />EACH <br />$3,000.00 <br />$12,000.00 <br />26. <br />Signal Strain Pole, 30' with 25' Mast Arm <br />4 <br />EACH <br />$8,700.00 <br />$34,800.00 <br />27 <br />Traffic Signal Head, 3 Section, 12" Red, Amber, <br />Green <br />4 <br />EACH <br />$880.00 <br />$3,520.00 <br />28 <br />Traffic Signal Head, 5 Section, 12" Red, Amber, <br />Green, Lt. Amber Arrow & Lt. Green Arrow <br />4 <br />EACH <br />$1,300.00 <br />$5,200.00 <br />29. <br />Service Point, TESCO Cabinet & Foundation <br />1 <br />EACH <br />$8,100.00 <br />$8,100.00 <br />30. <br />Disconnect Hanger <br />4 <br />EACH <br />$380.00 <br />$1,520.00 <br />31. <br />Handhole, Traffic <br />1 <br />EACH <br />$1,200.00 <br />$1,200.00 <br />32. <br />Conduit, HDPE Schedule 80, 3" <br />190 <br />LFT <br />$9.00 <br />$1710.00 <br />33. <br />Span, Catenary and Tether <br />4 <br />EACH <br />$2,200.00 <br />$8,800.00 <br />34. <br />Signal Cable, 3c/8 GA <br />30 <br />LFT <br />$3.00 <br />$90.00 <br />35. <br />Signal Cable, 5c/14 GA <br />114 <br />LFT <br />$3.00 <br />$342.00 <br />36. <br />Signal Cable, 7c/14 GA <br />663 <br />LFT <br />$3.10 <br />$2,055.30 <br />37. <br />Signal Cable, Coax <br />670 <br />LFT <br />$2.50 <br />$1,675.00 <br />38. <br />Luminaire for Street Lighting <br />2 <br />EACH <br />$650.00 <br />$1,300.00 <br />39. <br />Lighting Cable, 3c/10 GA <br />325 <br />LFT <br />$4.00 <br />$1,300.00 <br />40. <br />Install Overhead Street Sign <br />10 <br />EACH <br />$145.00 <br />$1,450.00 <br />41. <br />Install Ground Mounted Sign <br />2 <br />EACH <br />$200.00 <br />$400.00 <br />42 <br />Pavement Marking, Thermoplastic, Thru & Right <br />Arrow <br />11 <br />EACH <br />$135.00 <br />$1,485.00 <br />43. <br />Pavement Marking, Thermoplastic, Left Arrow <br />11 <br />EACH <br />$90.00 <br />$990.00 <br />44. <br />Line, Solid, White, Thermoplastic, 4" <br />1,820 <br />LFT <br />$1.25 <br />$2,275.00 <br />45. <br />Line, Solid, Yellow, Thermoplastic, 4" <br />2,510 <br />LFT <br />$1.25 <br />$3,137.50 <br />46. <br />Line, Solid, White, Thermoplastic, 8" <br />326 <br />LFT <br />$1.50 <br />$489.00 <br />47. <br />Line, Solid, Yellow, Thermoplastic, 8" <br />202 <br />LFT <br />$1.50 <br />$303.00 <br />48 <br />Transverse Line, Thermoplastic, White, 24", Stop <br />Bar <br />157 <br />LFT <br />$7.50 <br />$1,177.50 <br />Version 01/13/2021 Contractor's Bid for Public Works - 8 <br />