Laserfiche WebLink
Project Name: Mayflower Road and Sample Street Traffic Improvements <br />Project Number: <br />For Bids Due: <br />120-052R <br />June 22, 2021 <br />Contractor Name: Rieth-Riley Construction Co., Inc <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Mobilization/Demobilization <br />1 <br />LS <br />$23,262.02 <br />$23,262.02 <br />2. <br />Construction Engineering <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />3. <br />Clearing Right of Way <br />1 <br />LS <br />$12,231.83 <br />$12,231.83 <br />4. <br />Concrete Curb, Remove <br />368 <br />LFT <br />$24.35 <br />$89960.80 <br />5. <br />Pavement, Remove <br />125 <br />SYD <br />$40.12 <br />$5,015.00 <br />6. <br />Signal Pole and Foundation, Remove <br />2 <br />EACH <br />$1,000.00 <br />$1,000.00 <br />7. <br />Maintenance of Traffic <br />1 <br />LS <br />$19,935.00 <br />$19,935.00 <br />8. <br />Traffic Signal Equipment, Remove and Salvage <br />1 <br />LS <br />$1,000.00 <br />$1,000.00 <br />9. <br />Common Excavation <br />1 <br />LS <br />$89385.46 <br />$8,385.46 <br />10. <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$1,459.73 <br />$1,459.73 <br />11. <br />Pavement Milling, 1.5" <br />442 <br />SYD <br />$21.36 <br />$9,441.12 <br />12. <br />HMA Surface, 9.5 mm, Type B <br />345 <br />TON <br />$114.05 <br />$399347.25 <br />13. <br />HMA Intermediate, 19.0 mm, Type B <br />40 <br />TON <br />$173.55 <br />$6,942.00 <br />14. <br />HMA Base, 25.0 mm, Type B <br />120 <br />TON <br />$96.13 <br />$11,535.60 <br />15. <br />Concrete Curb <br />332 <br />LFT <br />$31.36 <br />$10,411.52 <br />16. <br />Concrete for Driveway, 6" <br />24 <br />SYD <br />$131.18 <br />$3,148.32 <br />17. <br />Drywell, 1200 Gal. <br />2 <br />EACH <br />$8,798.50 <br />$179597.00 <br />18. <br />Catch Basin <br />1 <br />EACH <br />$3,495.20 <br />$3,495.20 <br />19. <br />Storm Pipe, 12" <br />20 <br />LFT <br />$76.31 <br />$1,526.20 <br />20. <br />Adjust Casting to Grade <br />2 <br />EACH <br />$480.28 <br />$960.56 <br />21. <br />Adjust Valve Box to Grade <br />2 <br />EACH <br />$177.92 <br />$355.84 <br />22. <br />Controller, TS -2 Cabinet and P1 Foundation <br />1 <br />EACH <br />$20,000.00 <br />$20,000.00 <br />Version 01/13/2021 Contractor's Bid for Public Works - 7 <br />