Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2021 Curb and Sidewalk Contruction <br />Project Number: 121-001 <br />For Bids Due: June 8, 2021 at 9:00am Local Time to ;. ,s southbendin.aov <br />Contractor Name: Milestone Contractors North, Inc. <br />DIVISION Al <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />205 <br />SYS <br />$ 45.00 <br />$ <br />9,225.00 <br />2 <br />CONCRETE SIDEWALK 4 -IN <br />205 <br />SYS <br />1 55.00 <br />$ <br />11.275.00 <br />3 <br />CONCRETE CURB, REMOVE <br />365 <br />LFT <br />$ 24.00 <br />$ <br />8.760.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />365 <br />LFT <br />$ 45.00 <br />$ <br />16,425.00 <br />5 <br />CONCRETE APPROACH REMOVE <br />22 <br />SYS <br />$ 50.00 <br />$ <br />1,100.00 <br />6 <br />PCCP FOR APPROACHES 6 -IN <br />22 <br />SYS <br />$ 115.00 <br />$ <br />2,530.00 <br />7 <br />TOPSOIL AND SEEDING <br />200 <br />SYS <br />$ 42.00 <br />$ <br />8,400.00 <br />8 <br />TREE REMOVE. 6 I <br />1 <br />EA <br />$ 100.00 <br />16 <br />100.00 <br />10 <br />TREE. REMOVE, 18 IN <br />1 <br />EA <br />$ 500.00 <br />$ <br />500.00 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />$ 100.00 <br />$ <br />100.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO <br />2.5 IN <br />3 <br />EA <br />$ 1,195.00 <br />$ <br />3,585.00 <br />15 <br />CURB RAMP, REMOVE <br />16 <br />SYS <br />$ 100.00 <br />$ <br />1,600.00 <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />$ 120.00 <br />$ <br />1.920.00 <br />DIVISION Al <br />$ <br />65,520.00 <br />DIVISION B1 <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price 1 <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />320 <br />SYS <br />$ 48.00 <br />$ 15,360.00 <br />2 <br />CONCRETE SIDEWALK 4 -IN <br />320 <br />SYS <br />$ 60.00 <br />$ 19 200.00 <br />3 <br />CONCRETE CURB. REMOVE <br />575 <br />LFT <br />$ 24.00 <br />$ 13.800.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />575 <br />LFT <br />$ 48.00 <br />$ 27,600.00 <br />7 <br />TOPSOIL AND SEEDING <br />320 <br />SYS <br />$ 35.00 <br />$ 11.200.00 <br />11 <br />TREE REMOVE 30 IN <br />2 <br />EA <br />$ 800.00 <br />$ 1.600.00 <br />13 <br />STUMP, REMOVE <br />2 <br />EA <br />$ 250.00 <br />$ 500.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO <br />2.5 IN <br />4 <br />EA <br />$ 1,045.00 <br />$ 4,180.00 <br />15 <br />CURB RAMP. REMOVE <br />5 <br />SYS <br />$ 100.00 <br />$ 500.00 <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />1 5.0 <br />SYS Is <br />120.00 <br />$ 600.00 <br />$ <br />2,890.00 <br />DIVISION B1 <br />$ 94,540.00 <br />DIVISION B2 <br />Item No. <br />Description <br />Quantity <br />Unit Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />170 <br />SYS $ <br />50.00 <br />$ <br />8,500.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />170 <br />SYS $ <br />65.00 <br />$ <br />11,050.00 <br />3 <br />CONCRETE CURB. REMOVE <br />240 <br />LFT $ <br />20.00 <br />$ <br />4,800.00 <br />4 <br />CONCRETE CURB MODIFIED <br />240 <br />LFT $ <br />45.00 <br />$ <br />10,800.00 <br />5 <br />CONCRETE APPROACH, REMOVE <br />90 <br />SYS $ <br />45.00 <br />$ <br />4,050.00 <br />6 <br />PCCP FOR APPROACHES 6 -IN <br />90 <br />SYS1 $ <br />80.00 <br />$ <br />7 200.00 <br />7 <br />TOPSOIL AND SEEDING <br />135 <br />SYS $ <br />45.00 <br />$ <br />6,075.00 <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA $ <br />600.00 <br />$ <br />1,200.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2 -IN TO <br />2.5 IN <br />2 <br />EA $ <br />1,445.00 <br />$ <br />2,890.00 <br />DIVISION B2 TOTAL <br />$ <br />56,565.00 <br />