My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/1904 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1904
>
12/1904 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:29:16 PM
Creation date
5/28/2021 11:32:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/1/1904
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Friday December 2. 1904. <br />ffi l <br />The Board met in regular session at 10 A. M. All members present. <br />The Hon Board of Public Works. <br />Gentlemen: -- <br />When the Fassnaeht avenue trunk sewer was started, I had the line laid out for the <br />center line of Brick avenue, but when the contractor excavated his trence to the depth <br />of -the old sewer returning into Brick avenue from Michigan avenue, we found the old sewer <br />curved to a point Four feet from the center line and in order to join the old sewer <br />properly I had to shift the line of the new sewer four feet at the south line of <br />Michigan avenue, running to nothing attthe manhole in the center of Euclid avenue. <br />The change required extra excavation, placing of sheeting and lengthening of braces <br />and I recommend tha allowance of the following amount to Peter Suzio Contractor, for <br />extra work done and for full and complete renumeration for the same. <br />With regard to the use of extra cement used in concrete, such cement was used at the <br />instance of the contractor for various reasons and not on the order of the Engineer <br />and no a1ik_:_wance could be properly made for the same. <br />66 yds. excavation and back filling Q 01.00 $66.00 <br />Placing sheeting 3600' Q .20 72.00 <br />Extra braces 500' Q .30 15.00 <br />153.00 <br />Profit 15 Per cent 22.q-9 <br />dt,1 %5.95 <br />Work of change in alignment of trence on Brick avenue next Michigan avenue. <br />Respectfully submitted, <br />Alonzo J. Hammond City Engineer. <br />Cor_imunication received from A. J. Major through Attorney Joseph G. Orr, regarding <br />the appropriation of land for the improvement of Vistula avenue and the moving of the <br />Street Railway tracks. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.