Laserfiche WebLink
BID TABULATION <br />2021 Community Crossings Round 1 <br />Project No: 121-014 <br />2021 Community Crossings Round 1 (121-014) <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $23,154.00 $23,154.00 $9,922.94 $9,922.94 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $41,161.00 $41,161.00 $16,930.00 $16,930.00 $3,185.00 $3,185.00 <br />3 Milling, Up to 3"10680 SY $4.00 $42,720.00 $2.75 $29,370.00 $2.31 $24,670.80 <br />4 HMA Surface, 9.5 mm – Type B 1680 TONS $70.00 $117,600.00 $70.00 $117,600.00 $80.00 $134,400.00 <br />5 HMA Wedge and Leveling – Type B 84 TONS $60.00 $5,040.00 $70.00 $5,880.00 $80.00 $6,720.00 <br />6 HMA for Patching 55 TONS $120.00 $6,600.00 $115.00 $6,325.00 $180.00 $9,900.00 <br />7 Tack Coat 8 TONS $1.00 $8.00 $1.00 $8.00 $1.00 $8.00 <br />8 Joint Adhesive, Surface 2730 LF $0.60 $1,638.00 $1.00 $2,730.00 $0.77 $2,102.10 <br />9 Adjust Manhole to Grade 14 EA $450.00 $6,300.00 $250.00 $3,500.00 $90.00 $1,260.00 <br />10 Adjust Water Valve Structure to Grade 9 EA $80.00 $720.00 $85.00 $765.00 $50.00 $450.00 <br />11 Adjust Inlet to Grade 59 EA $110.00 $6,490.00 $250.00 $14,750.00 $90.00 $5,310.00 <br />12 Concrete Curb Ramp, Removal 604 SY $50.00 $30,200.00 $30.00 $18,120.00 $50.00 $30,200.00 <br />13 Concrete Curb Ramp, Installation 604 SY $200.00 $120,800.00 $145.00 $87,580.00 $177.00 $106,908.00 <br />14 Transverse Marking, Thermoplastic, Solid, White, 24"19 LF $10.00 $190.00 $24.00 $456.00 $6.95 $132.05 <br />15 Line, Thermoplastic, Solid, White, 6"104 LF $2.75 $286.00 $2.89 $300.56 $2.95 $306.80 <br />16 Line, Thermoplastic, Solid Yellow, 4", Grooved 345 LF $0.95 $327.75 $5.00 $1,725.00 $2.95 $1,017.75 <br />17 Concrete Header 6"w x 12"d 385 LF $50.00 $19,250.00 $41.50 $15,977.50 $61.00 $23,485.00 <br />18 Traffic Detector Loop Replacement 2 EA $450.00 $900.00 $450.00 $900.00 $450.00 $900.00 <br />19 Traffic Detector Housing Replacement 1 EA $690.00 $690.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 <br />20 Pedestrian Push Button Replacement 4 EA $400.00 $1,600.00 $940.00 $3,760.00 $940.00 $3,760.00 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $14,607.00 $14,607.00 $6,124.80 $6,124.80 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $20,867.00 $20,867.00 $9,900.00 $9,900.00 $3,000.00 $3,000.00 <br />3 Milling, Up to 3"8840 SY $4.00 $35,360.00 $2.75 $24,310.00 $2.31 $20,420.40 <br />4 HMA Surface, 9.5 mm – Type B 1460 TONS $70.00 $102,200.00 $71.00 $103,660.00 $80.00 $116,800.00 <br />5 HMA Wedge and Leveling – Type B 73 TONS $60.00 $4,380.00 $71.00 $5,183.00 $80.00 $5,840.00 <br />6 HMA for Patching 48 TONS $120.00 $5,760.00 $125.00 $6,000.00 $180.00 $8,640.00 <br />7 Tack Coat 6 TONS $1.00 $6.00 $1.00 $6.00 $1.00 $6.00 <br />8 Joint Adhesive, Surface 2400 LF $0.60 $1,440.00 $1.00 $2,400.00 $0.77 $1,848.00 <br />9 Adjust Manhole to Grade 9 EA $450.00 $4,050.00 $250.00 $2,250.00 $90.00 $810.00 <br />10 Adjust Water Valve Structure to Grade 5 EA $80.00 $400.00 $85.00 $425.00 $50.00 $250.00 <br />11 Adjust Inlet to Grade 27 EA $110.00 $2,970.00 $250.00 $6,750.00 $90.00 $2,430.00 <br />12 Concrete Curb Ramp, Removal 212 SY $50.00 $10,600.00 $30.00 $6,360.00 $50.00 $10,600.00 <br />13 Concrete Curb Ramp, Installation 212 SY $200.00 $42,400.00 $150.00 $31,800.00 $177.00 $37,524.00 <br />14 Line, Thermoplastic, Solid, White, 6"80 LF $2.75 $220.00 $2.89 $231.20 $2.95 $236.00 <br />$337,600.00 <br />Rieth Riley <br />DIVISION 2 TOTAL $245,260.00 $205,400.00 <br />Rieth Riley <br />$212,404.40 <br />Engineer's Estimate Milestone <br />$359,715.50 <br />Division 2: Sherman Ave from Lincolnway to Vassar Ave Engineer's Estimate Milestone <br /> DIVISION 1: LINDSEY AVE FROM PORTAGE AVE TO BLAINE AVE <br />DIVISION 1 TOTAL $425,674.75 <br />S:\Public Works\Projects\Projects by Year\2021 Projects\121-014 2021 CCMG - 1\1 - Admin\1 - BPW Documents\Bid Tabulation