Laserfiche WebLink
BID TABULATION <br />2021 Community Crossings Round 1 <br />Project No: 121-014 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $11,349.00 $11,349.00 $5,235.53 $5,235.53 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $16,212.00 $16,212.00 $7,900.00 $7,900.00 $3,000.00 $3,000.00 <br />3 Milling, Up to 3"5900 SY $4.00 $23,600.00 $3.00 $17,700.00 $2.31 $13,629.00 <br />4 HMA Surface, 9.5 mm – Type B 970 TONS $70.00 $67,900.00 $70.00 $67,900.00 $80.00 $77,600.00 <br />5 HMA Wedge and Leveling – Type B 49 TONS $60.00 $2,940.00 $70.00 $3,430.00 $80.00 $3,920.00 <br />6 HMA for Patching 32 TONS $120.00 $3,840.00 $160.00 $5,120.00 $180.00 $5,760.00 <br />7 Tack Coat 4 TONS $1.00 $4.00 $1.00 $4.00 $1.00 $4.00 <br />8 Joint Adhesive, Surface 1710 LF $0.60 $1,026.00 $1.00 $1,710.00 $0.77 $1,316.70 <br />9 Adjust Manhole to Grade 6 EA $450.00 $2,700.00 $250.00 $1,500.00 $90.00 $540.00 <br />10 Adjust Water Valve Structure to Grade 3 EA $80.00 $240.00 $85.00 $255.00 $50.00 $150.00 <br />11 Adjust Inlet to Grade 8 EA $110.00 $880.00 $250.00 $2,000.00 $90.00 $720.00 <br />12 Concrete Curb Ramp, Removal 241 SY $50.00 $12,050.00 $30.00 $7,230.00 $50.00 $12,050.00 <br />13 Concrete Curb Ramp, Installation 241 SY $200.00 $48,200.00 $140.00 $33,740.00 $177.00 $42,657.00 <br />14 Transverse Marking, Thermoplastic, Solid, White, 24"30 LF $10.00 $300.00 $24.00 $720.00 $6.95 $208.50 <br />15 Line, Thermoplastic, Solid, White, 6"123 LF $2.75 $338.25 $2.89 $355.47 $2.95 $362.85 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $16,480.00 $16,480.00 $6,521.53 $6,521.53 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $34,028.00 $34,028.00 $11,600.00 $11,600.00 $3,000.00 $3,000.00 <br />3 Milling, Up to 3"12070 SY $4.00 $48,280.00 $2.75 $33,192.50 $2.31 $27,881.70 <br />4 HMA Surface, 9.5 mm – Type B 1990 TONS $70.00 $139,300.00 $68.00 $135,320.00 $80.00 $159,200.00 <br />5 HMA Wedge and Leveling – Type B 100 TONS $60.00 $6,000.00 $68.00 $6,800.00 $80.00 $8,000.00 <br />6 HMA for Patching 66 TONS $120.00 $7,920.00 $130.00 $8,580.00 $180.00 $11,880.00 <br />7 Tack Coat 8 TONS $1.00 $8.00 $1.00 $8.00 $1.00 $8.00 <br />8 Joint Adhesive, Surface 2880 LF $0.60 $1,728.00 $1.00 $2,880.00 $0.77 $2,217.60 <br />9 Adjust Manhole to Grade 10 EA $450.00 $4,500.00 $250.00 $2,500.00 $90.00 $900.00 <br />10 Adjust Water Valve Structure to Grade 9 EA $80.00 $720.00 $85.00 $765.00 $50.00 $450.00 <br />11 Adjust Inlet to Grade 39 EA $110.00 $4,290.00 $250.00 $9,750.00 $90.00 $3,510.00 <br />12 Concrete Curb Ramp, Removal 103 SY $50.00 $5,150.00 $30.00 $3,090.00 $50.00 $5,150.00 <br />13 Concrete Curb Ramp, Installation 103 SY $200.00 $20,600.00 $145.00 $14,935.00 $177.00 $18,231.00 <br />14 Transverse Marking, Thermoplastic, Solid, White, 24"23 LF $10.00 $230.00 $24.00 $552.00 $6.95 $159.85 <br />15 Line, Thermoplastic, Solid, White, 6"73 LF $2.75 $200.75 $2.89 $210.97 $2.95 $215.35 <br />16 Line, Thermoplastic, Solid, Yellow, 4", Grooved 914 LF $0.95 $868.30 $5.00 $4,570.00 $2.95 $2,696.30 <br />17 Line, Thermoplastic, Solid, White, 4", Grooved 85 LF $0.95 $80.75 $5.00 $425.00 $2.95 $250.75 <br />18 Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow 2 EA $150.00 $300.00 $250.00 $500.00 $100.00 $200.00 <br />Division 4: Indiana Ave from Michigan St to High St Engineer's Estimate Milestone Rieth Riley <br />DIVISION 4 TOTAL $290,683.80 $242,200.00 $247,950.55 <br /> DIVISION 3: Coquillard Dr from Jefferson Blvd to Colfax Ave Engineer's Estimate Milestone Rieth Riley <br />DIVISION 3 TOTAL $191,579.25 $154,800.00 $165,918.05 <br />S:\Public Works\Projects\Projects by Year\2021 Projects\121-014 2021 CCMG - 1\1 - Admin\1 - BPW Documents\Bid Tabulation