Laserfiche WebLink
REGULAR MEETING MAY 11,2021 93 <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />ralvarado@rieth-riley.com <br />Bid was signed by Mr. Ruben Alvarado <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />BID: Base Bid Total (Items 1-108) $1,740,871.20 <br />MILESTONE CONTRACTORS NORTH, INC. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />akruegerna milestonelp.com <br />Bid was signed by Mr. Dustin Hilary <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />BID: Base Bid Total (Items 1-108) $1,799,100.00 <br />Upon a motion made by Mr. Molnar, seconded by Mr. Gathers and carried by roll call, the above <br />bids were referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF BIDS — SOUTHEAST NEIGHBORHOOD CENTER (UNITED WAY) — <br />PROJECT NO. 119-093 (PR-00008109) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />4050 Ralph Jones Dr. <br />South Bend, IN 46628 <br />kkromer@zbuild.com <br />Bid was signed by Mr. Bill Favors <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />me <br />Item <br />Description <br />Quantity <br />Unit <br />Total <br />No. <br />1 <br />Demolition clearing & <br />1 <br />LS <br />$250,000.00 <br />grubbing, grading, site <br />preparation, and <br />miscellaneous to complete the <br />work. <br />2 <br />Site Utilities, piping, below <br />1 <br />LS <br />$350,000.00 <br />grade storage, bedding, <br />backfill, testing, taps, fittings, <br />valves, structures, and <br />miscellaneous to complete <br />work. <br />3 <br />Concrete, curbs, sidewalks, <br />1 <br />LS <br />$200,000.00 <br />ADA ramps, approach, frost <br />slabs, and miscellaneous to <br />complete work. <br />4 <br />Asphalt paving, pavements <br />1 <br />LS <br />$100,000.00 <br />markings, subgrade <br />preparation, aggregates, etc. <br />