Laserfiche WebLink
L FAVAVA <br /> Additional Design Tasks <br /> • Design and plans for decorative City street lighting. <br /> • Analysis, design and plans for an additional detention pond and outlet control <br /> structure to serve the Caroline Properties (Gates) development. <br /> • Water line extension added on East Barbie Street. <br /> • Two additional plan revisions for the Carl Kay Parcel. <br /> • Traffic analysis and multiple drive revisions for Lock Joint Tube. <br /> Reversion back to previous designs caused by LJT building addition. <br /> • Design of a construction access driveway for Heraeus Kulzer. <br /> • Quotation project and documents for a separate demolition contract of three parcels. <br /> • Additional survey and design work for West Chippewa (south side). <br /> • 2nd Letting and Construction Documents (submitted on October 2, 2012). <br /> • Wendy's drive revision. <br /> • Additional plan work for Falls Creek irrigation and lighting. <br /> • Preparation of 3`d Letting and Construction Documents. <br /> Additional Coordination Tasks <br /> • Prepare agreement/offer document for AMC Theatres & Caroline Partners. <br /> • Extra meetings with Lock Joint Tube, South Gateway Properties, Pinney Drive quote. <br /> • Coordination and completion of locating work on Ladson's septic tank. <br /> • Assistance with AEP Transmission Relocation Agreement. <br /> • Coordination with Falls Creek Development - additional site research. <br /> • Preparation of Replat (legal descriptions, easements). <br /> • Coordination, Specifications. Public Meeting and Sign Design for City's Project <br /> Communication Outreach. <br /> • Preparation of Miscellaneous Exhibits/Drawings for Property Acquisition. <br /> December, 2012 Page 2 Project File No. 9022.14 <br />