Laserfiche WebLink
36 <br />REGULAR MEETING MARCH 23, 2021 <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, in the amount of $222,079.50 <br />for the base bid. Therefore, Mr. Gilot made a motion that the recommendation be accepted, and <br />the bid be awarded, and the contract approved as outlined above. Mr. Gathers seconded the <br />motion, which carried by roll call. <br />AWARD BID AND APPROVE CONTRACT — ROOF RESTORATION & REPLACEMENT <br />AT 506 & 510 SOUTH MAIN ST. (FORMER SALVATION ARMY) — PROJECT NO. 119- <br />084B (PR-00004394) <br />Mr. Zach Hurst, Engineering, advised the Board that on February 9, 2021, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Hurst <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Midland Engineering Company, Inc., 52369 State Road 933 North, South Bend, IN 46637, in the <br />amount of $440,100 for the base bid plus alternate No. 1. Ms. Maradik noted for the record that <br />the lowest bidder on this project was found to be non -responsive. Therefore, Mr. Gilot made a <br />motion that the recommendation be accepted, and the bid be awarded, and the contract approved <br />as outlined above. Mr. Gathers seconded the motion, which carried. <br />AWARD QUOTATION AND APPROVE CONTRACT — EL CAMPITO WATER TAP <br />QUOTE — PROJECT NO. 121-017 (PR-00007560) <br />Ms. Alicia Pellegrino, Engineering, advised the Board that on March 9, 2021, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Pellegrino recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Selge Construction Co., Inc., 2833 South 1 Ph. St., Niles, MI 49120, in the <br />amount of $17,725 for the base bid plus alternate No. 1. Therefore, Mr. Gilot made a motion that <br />the recommendation be accepted, and the quotation be awarded, and the contract approved as <br />outlined above. Mr. Gathers seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — 2021 TRUCKING OF BIOSOLIDS <br />FOR LAND APPLICATION — PROJECT NO. 121-023 (PR-0007482) <br />Mr. Jacob Klosinski, Engineering, advised the Board that on March 9, 2021, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Klosinski recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Trucks R Us, Inc., 23300 State Road 23, South Bend, IN 46614, in the <br />amount of $125 per hour, per truck in an amount not to exceed $130,000. Therefore, Mr. Gilot <br />made a motion that the recommendation be accepted, and the quotation be awarded, and the <br />contract approved as outlined above. Mr. Gathers seconded the motion, which carried by roll <br />call. <br />APPROVAL OF REQUEST TO REJECT BIDS AND TO RE -ADVERTISE— IGNITION <br />PARK EV CHARGING LOT — PROJECT NO. 120-044 (RWDA TIF) <br />In a memorandum to the Board, Mr. Finnian Cavanaugh, Engineering, requested permission to <br />reject all bids for the above referenced project due to MWBE goal clarification issues. Ms. <br />Maradik clarified for the record that the City provided a detailed memo in which it explained that <br />the bid package included an outdated version form MWBE 2.0, Good Faith Efforts. Therefore, <br />upon a motion made by Mr. Gilot, seconded by Mr. Gathers and carried by roll call, the above <br />request to reject bids and to re -advertise the project was approved. <br />APPROVE CHANGE ORDER NO. 7 — CORBY IRONWOOD ROCKNE INTERSECTION <br />IMPROVEMENT —PROJECT NO. 116-034 (PO-0005643) <br />Ms. Leslie Biek, Engineering, has submitted Change Order No. 7 on behalf of INDOT and <br />Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614 indicating the <br />contract amount be increased by $32,490.66 (City's share is $6,498.13) for a new contract sum, <br />including this Change Order, in the amount of $3,209,996.05. Upon a motion made by Mr. Gilot, <br />seconded by Mr. Gathers and carried by roll call, the Change Order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — WASHINGTON STREET <br />IMPROVEMENTS — PROJECT NO. 118-105 (RWDA TIF) <br />Ms. Maradik advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, for the <br />above referenced project, indicating a final cost of $420,000. Upon a motion made by Mr. Gilot, <br />