Laserfiche WebLink
1.12 The contractor shall provide pipe end to securely attach to 12" PVC storm pipe. <br />1.13 Alternate #1 the concrete seat wall shall be standard concrete, not integral color, with hard <br />anodized skatestops. <br />1.14 The site contractor shall be responsible for installation of all lighting features, counduit, wire, etc. <br />PART 2 - SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISION XIII Prosecution and Progress, Page 5 <br />1. REPLACE Sub -item lines B.1 with: <br />a. 1. The project will have a substantial completion date of July 16th, 2021 (105) calendar <br />days for all site work. The contract time will start when the Notice to Proceed is <br />delivered and signed. The project will have a final completion including all lighting and <br />landscaping of October 1, 2021. <br />2.02 SPECIAL PROVISION XXX Concrete Sidewalks, Page 14 <br />1. REMOVE Sub -item Line B.6 about Colored Concrete <br />2.03 SPECIAL PROVISION XLVII Concrete Seat Wall, Page 29 <br />1. REPLACE Sub -item lines A.1 and A.2with <br />a. 1. This item shall include, but not be limited to, all labor, materials, tools, equipment, <br />excavation, backfill, compaction, formwork, skate stops, etc. to construct the proposed <br />concrete seatwall. This work will be in accordance with INDOT Standard <br />Specifications for Structural Concrete and Reinforcing Steel (Sections 702 and 703). <br />b. 2. Aluminum skate stops shall be surface mounted Gorilla 135 Series through <br />Skatestoppers. Contractor shall install per manufacturers specifications. Color shall be: <br />Hard Anodized Finish. <br />2.04 SPECIAL PROVISION, BID PROPOSAL <br />1. REPLACE Bid Tabs with attached BID TAB document. Line items, item descriptions and <br />quantities have been revised. <br />PART 3 - CONSTRUCTION DOCUMENTS <br />3.01 SHEET 5, SITE DIMENSIONAL PLAN: <br />1. REPLACE sheet with attached plan sheet. Revisions 4" for all sidewalks. <br />3.02 SHEET 7, SITE UTILITY PLAN: <br />1. REPLACE sheet with attached plan sheet. Revisions include clarification on EV Charging <br />foundations and locations and TESCO box. <br />3.03 SHEET 8, SITE LIGHTING PLAN: <br />1. REPLACE sheet with attached plan sheet. Revisions include clarification all conduit to be <br />sized 3" schedule 80. <br />3.04 SHEET 11, SITE CONSTRUCTION DETAILS: <br />1. REPLACE sheet with attached plan sheet. Revisions include revisions to Concrete <br />Pavement Detail. <br />3.05 SHEET 12, SITE CONSTRUCTION DETAILS ALTERNATES: <br />1. REPLACE sheet with attached plan sheet. Revisions include updated structure and <br />foundation details. <br />3.06 <br />