My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ignition Park EV Charging Park Proj No. 120-044 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - Ignition Park EV Charging Park Proj No. 120-044 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 2:13:08 PM
Creation date
3/9/2021 2:11:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1316 COUNTY -CITY BUILDING <br />227 W. JEFFERSON BOULEVARD <br />SOUTH BEND, INDIANA 46601-1830 <br />Date: March 5, 2021 <br />To: All Plan Holders <br />PHONE 574/235-9251 <br />FAx 574/ 235-9171 <br />TDD 574/ 235-5567 <br />CITY OF SOUTH[ BEND PETE BUTTIGIEG, MAYOR <br />BOARD OF PUBLIC WORKS <br />Ignition Park: EV Charging Park <br />120-044 <br />Addendum No. 1 <br />From: Finnian Cavanaugh, Project Manager <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected, and the remainder of the original contract document is to remain in its <br />entirety. The addendum consists of 18 pages total inclusive of Acknowlegement of Receipt and Pre -Bid <br />Meeting Agenda. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1— CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART 1 - CLARIFICATIONS <br />1.01 The City has updated the date of substantial completion to July 16th, with understanding that final <br />plantings shall be planted in the fall, prior to final completion of October 1 st. Any further <br />changes to the project timeline shall conform with Special Provision Section XIV Change of <br />Contract Time. <br />1.02 The Contractor shall refer to Special Provision Section VII Insurance for information on <br />Builder's Risk. <br />1.03 A line item for Mobilization and Demobilization has been added to the Bid Form. <br />1.04 All quantities on the revised, attached Bid Form are correct. <br />1.05 The Contractor shall refer to the City of South Bend Standard Specifications for all concrete and <br />asphalt pavement thicknesses. All sidewalk concrete shall be 4" thick reinforced per the <br />specifications. <br />1.06 The Contractor shall be responsible for the installation of all lighting features, conduit, wire, etc. <br />1.07 The proposed light poles shall not have any GFI receptacles. <br />1.08 The Contractor shall be responsible for the installation of the TESCO foundation, box, and <br />conduits (including pull line) running north to the charging locations. The foundation shall be <br />sized per City Standard Detail 6-1 Service Point — Single Meter. See attached Detail. <br />1.09 The AEP contractor shall be responsible for the power connection to the TESCO box, running <br />wire through the provided conduit, and installation and connection of the new EV Charging <br />locations. The Contractor shall coordinate all work with the AEP contractor. <br />1.10 The Contractor shall be responsible for the installation of the seven (7) foundations for the EV <br />Charging Stations. <br />1.11 All conduit, for both the lighting and EV Charging runs shall be 3" schedule 80 PVC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.