Laserfiche WebLink
Page 3 <br />Exhibit C – Compensation Packet BC-4: Basic Services (other than RPR) – Direct Labor Costs Times a Factor Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT C, consisting of pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-4: Basic Services – Direct Labor Costs Times a Factor <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Direct Labor <br />Costs Times a Factor Method of Payment <br />A.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1.An amount equal to Engineer’s Direct Labor Costs times a factor of for the services <br />of Engineer’s personnel engaged on the Project, plus Reimbursable Expenses, estimated to <br />be $__________________, and Engineer’s Consultant’s charges, if any, estimated to be <br />$__________________. <br />2. Engineer’s Reimbursable Expenses Schedule is attached to this Exhibit C as Appendix 1. <br />3.The total compensation for services under Paragraph C2.01 is estimated to be <br />$__________________ based on the following distribution of compensation: <br />a.Study and Report Phase $______________________ <br />b.Preliminary Design Phase $______________________ <br />c.Final Design Phase $______________________ <br />d.Bidding or Negotiating Phase $______________________ <br />e.Construction Phase $______________________ <br />f.Post-Construction Phase $______________________ <br />4.Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See C2.03.C.2 <br />below.