My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Road Rehabilitation of Ten (10) City Streets - Hanson Professional Services, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Road Rehabilitation of Ten (10) City Streets - Hanson Professional Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 4:09:39 PM
Creation date
2/23/2021 4:04:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />Exhibit C – Compensation Packet BC-3: Basic Services (other than RPR) –Percentage of Construction Cost Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />a.The portion of the amounts billed for Engineer’s services which is on account of the <br />Percentage of Construction Cost will be based upon Engineer’s estimate of the <br />percentage of the total services actually completed during the billing period. <br />b.Upon conclusion of each phase of Basic Services, Owner shall pay such additional <br />amount, if any, as may be necessary to bring total compensation paid during such phase <br />on account of the percentage of Construction Cost to the following estimated <br />percentages of total compensation payable on account of the percentage of <br />Construction Cost for all phases of Basic Services: <br />Study and Report Phase % <br />Preliminary Design Phase % <br />Final Design Phase % <br />Bidding or Negotiating Phase % <br />Construction Phase % <br /> 100% <br />c.Engineer may alter the distribution of compensation between individual phases of the <br />work noted herein to be consistent with services actually rendered, but shall not exceed <br />the total estimated compensation amount unless approved in writing by Owner.
The URL can be used to link to this page
Your browser does not support the video tag.