2.08 SPECIAL PROVISIONS, Page 26, Section XLVII, Concrete Sidewalks and Curb Ramps:
<br />1. DELETE Item B, No. 4 note, "The concrete mix for concrete flatwork shall include a micro -
<br />reinforcement homopolymer polypropylene fibrillated fiber system. Fibermesh 300 or
<br />approved equal."
<br />2.09 SPECIAL PROVISION, Page 27, Section XLVIII, PCCP for Approaches
<br />1. REVISE Item B, No. 8, pay item description to read, "PCCP FOR APPROACH, 6 IN ............ SYS."
<br />2.10 SPECIAL PROVISION, Page 27, Section XLIX, PCCP Concrete Infill
<br />1. DELETE Special Provision for PCCP Concrete Infill.
<br />2. REPLACE with HMA Patching, Type B, Special Provision attached, pg 28.
<br />2.11 SPECIAL PROVISION, Page 31, Section LV, Wire
<br />1. REVISE Item B, No. 2, to read "The cable shall be installed using the black wire for Load 1,
<br />the red wire for Load 2, the white wire for Neutral, and the green wire for Earth Ground."
<br />2.12 SPECIAL PROVISION, Page 32, Section LVIII, Fence, Ornamental
<br />1. REVISE Item B, No. 2, Manufacture Description to read, " Model: Canterbury, 3 Rail, ornamental
<br />fence through Ironworld Fence Products. Color: Black. Phone: 1-866-310-2747, OR Approved
<br />Equal."
<br />2.13 SPECIAL PROVISION, Page 39, Section LXIII, Mulched Seeding
<br />1. REVISE Item B, No. 1, to read, "Incidental to seeding shall also include the delivery and
<br />placement of topsoil to a depth of 4 inches in all areas designated to receive sod, to be
<br />verified by project inspector."
<br />2.14 CONTRACTOR'S BID, Pages 7-9, Section BID/PROPOSAL
<br />1. REPLACE previous Bid Tabs with the attached document. The following item descriptions
<br />and quantities have been revised.
<br />2. REVISE Item 2, Maintenance of Traffic unit of payment to be LS
<br />3. REVISE Item 19 to read, "PCCP for Approach, 6 IN"
<br />4. REVISE Item 20 to read, "HMA Patching, Type B"
<br />5. REVISE Item 27 quantity to read, 9 EA
<br />2.15 CONTRACTOR'S BID, Pages 10-11 and 14-15
<br />1. REPLACE previous MWBE 1.0 Utilization Plan forms with the attached documents. The
<br />MWBE goals have been added.
<br />2. REPLACE previous MWBE 2.1 MWBE Contacted forms with the attached documents. The
<br />MWBE goals have been added.
<br />PART 3— PLANS
<br />3.01 COVER SHEET
<br />1. REPLACE sheet with attached plan sheet. Revisions to sheet include Board of Public Works
<br />and City Staff signatures.
<br />3400 Block S. Michigan Street Improvements Addendum #1
<br />February 19, 2021 Page 3
<br />
|