My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
738 Leland Avenue_COA 2021-0127A
sbend
>
Public
>
Historic Preservation
>
2021
>
February
>
738 Leland Avenue_COA 2021-0127A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 4:43:28 PM
Creation date
2/11/2021 4:42:48 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
738 Leland Avenue
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) remove three small trees in back yard (photos) and remove damaged fence between front <br />and back yards. The tree removal is primarily intended to make access to the back of the house <br />easier, both for the next couple of years when there will be a lot of construction, and in general. <br />When things are a little more settled I’d like to plant one or two fruit trees in the back yard to <br />replace them. I will probably eventually want to replace the fence, but what’s there now is not <br />in good shape and again, removing it will make access easier. <br />3) Remove upper story of back porch and remove fire escape (see photo below). The second <br />story of the back porch is in particularly bad shape -- giant holes in the roof, rotted out floor. <br />The first floor of the porch, while in need of substantial repair, is in much better shape , with a <br />sound floor and mostly intact framing. It’s also older, dating prior to 1917 per the Sanborn <br />maps. It seems worth repairing, particularly since it provides access to the basement stairs; <br />removing it altogether would necessitate moving the basement access. Therefore, I’m <br />proposing demolishing the second story (and the fire escape attached to it) and repairing the <br />first floor. Exterior material will depend on decisions made about the rest of the exterior (see <br />#4).
The URL can be used to link to this page
Your browser does not support the video tag.