My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Design, Inspection and Recommendation Services for SBPD Roof Repairs – WDi Architecture, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Design, Inspection and Recommendation Services for SBPD Roof Repairs – WDi Architecture, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:45:14 PM
Creation date
1/12/2021 3:45:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />2 | P a g e <br /> <br /> <br />Repair Metal Panels: Apply insulated panels to the existing wall will have a direct impact on energy savings. Currently, <br />approximately 5,000 square feet of non-insulated metal wall panels. <br /> <br />Ladder: Provide a stair system that is compliant with current regulations and has a small platform at the top to allow <br />for more movement. <br /> <br />Fall Protection - Add Alternate 1: Provide protection for twelve 52”x52” square skylights across the roof. <br /> <br />A. Compensation: For the Architect’s Amended Services described above, the Owner shall compensate the <br />Architect as Follows: <br /> <br />The Architect’s compensation shall be a Flat Fee base structure at a maximum not-to exceed cost of $ <br />38,080.00 (Thirty-Eight thousand eighty dollars and no/cents). <br /> <br />The Architect shall bill at the following Phases in services (Also see EXHIBIT ‘C’): <br /> <br /> Schematic Design & Design Development (SD/DD) 30% $11,424.00 <br /> Construction Documents (CD) 45% $17,136.00 <br /> Bidding/Negotiation Phase (BID) 5% $ 1,904.00 <br /> Construction Administration CA) 20% $ 7,616.00 <br /> Total $ 100% $38,080.00 <br />This contract shall end 120 days from the contract date unless noted otherwise. <br /> <br />B. Projected Schedule: <br /> <br />Task Start (estimated) Complete <br />Contract Negotiations December 16, 2021 January 6, 2021 <br />Kick-off Meeting January 20, 2021 <br />Schematic Design & Design Development 100% January 20, 2021 January 28, 2021 <br />DD Owner Review January 28, 2021 January 30, 2021 <br />Construction Documents 100% January 31, 2021 February 14, 2021 <br />CD Owner Review February 14, 2021 February 21, 2021 <br />Advertise for Bid February 24, 2021 February 28, 2021 <br />Bid and Negotiations March 6, 2021 <br />Construction Kick - off March 9, 2021 <br />Shop Drawing Review March 16,2021 March 27, 2021 <br />Construction Start Date April 1, 2021 June 29, 2021 <br />Construction Punch June 29, 2021 <br />Submit Substantial Completion June 30, 2021 <br /> <br /> <br />D. WDi Insurance: For the insurance coverage WDi will assign EJCDC as holder of the types and in the amounts <br />described below: <br /> General Liability Insurance – with a combined single limit of not less than $1,000,000 each <br />occurrence/$1,000,000 in the annual aggregate. <br /> Business Automobile Liability Insurance – with a combined single limit of not less than $1,000,000 each <br />accident.
The URL can be used to link to this page
Your browser does not support the video tag.