My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - Design, Inspection and Recommendation Services for SBPD Roof Repairs – WDi Architecture, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - Design, Inspection and Recommendation Services for SBPD Roof Repairs – WDi Architecture, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:45:14 PM
Creation date
1/12/2021 3:45:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Board of Public Works <br />Clara McDaniels, Assistant City Attorney Public Works <br />Linda M. Martin, Clerk <br />FROM: Leslie Biek, P.E., Assistant City Engineer <br />SUBJECT: PN: 119-080 SBPD Roof Repair <br />(PROJ00000234; PR-00005919) <br />Amendment #1 to PSA Agmt with WDi Architecture <br />DATE: 12/9/2020 Attached is Amendment #1 to the PSA with WDi Architecture for the SBPD Roof Repair <br />Project (119-080). Last year WDi was contracted to perform on-site inspection of the <br />roof of the South Bend Police Department Headquarters Building (701 W Sample St) <br />and provided recommendations. The SBPD has now secured the funding to proceed <br />with the repair, therefore WDi has provided an addendum to perform the design and <br />provide the bidding documents for the roof repair. <br /> <br />The project will include partial replacement and rehabilitation of the roof, removal and <br />inspection of the roof top ductwork, application of 5,000ft2 insulated metal wall panels to <br />improve energy efficiency, ladder, stair system, and fall protection. <br /> <br />Funding: Building Improvements 404-43001 <br /> <br />It is requested the Board of Public Works approve Amendment #1 to the SBPD Roof Repair <br />(119-080) PSA with WDi Architecture for an increase of $38,080 to the contract price bring <br />the final contract price to $52,360.00. <br /> <br />Thank you for your consideration of this request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.