My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail Phase I Proj No. 115-063 - DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 3:34:48 PM
Creation date
1/12/2021 3:31:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend | Coal Line Trail (Phase I) | Construction Engineering Services | 8 <br />Challenge <br />It is anticipated the project will be <br />constructed predominantly at grade. <br />However, a grade separation will be <br />constructed to align the proposed trail <br />with Portage Avenue. In order to achieve <br />this, a separate path will be constructed <br />off of the main trail, and cuts and fills will <br />be needed. The existing subgrade material <br />can cause an issue in obtaining the <br />required subgrade bearing capacity. <br />Solution <br />Careful inspection of the subgrade <br />during construction will identify the areas <br />exhibiting soft or yielding soil. Ensuring <br />that proper benching is performed <br />when constructing the fills may also be <br />necessary. The grade separation will consist <br />of a separate path that must be ADA <br />compliant and tie-in at Portage Avenue <br />using stairs. <br />GRADE SEPARATION <br />View of Portage Avenue Looking Northwest
The URL can be used to link to this page
Your browser does not support the video tag.