Laserfiche WebLink
BID TABULATIONProject Name: Guardrail Replacement and InstallationProject No: 118‐084DIVISION 4Item No. Line Item Quantity UnitUnit Price Cost Unit Price Cost Unit Price Cost1Construction Engineering 1                        LS $2,000.00 $2,000.00 $4,745.00 $4,745.00 $1,200 $1,200.002CPM Schedule 1                        LS $1,000.00 $1,000.00 $245.00 $245.00 $600.00 $600.003CPM Schedule, Monthly Update 4                        EA $250.00 $1,000.00 $100.00 $400.00 $500.00 $2,000.004Maintaining Traffic 1                        LS $10,000.00 $10,000.00 $3,950.00 $3,950.00 $3,600.00 $3,600.005Video Record 1                        LS $500.00 $500.00 $200.00 $200.00 $450.00 $450.006Mobilization and Demobilization 1                        LS $2,305.00 $2,305.00 $7,610.00 $7,610.00 $12,000.00 $12,000.007Clearing and Grubbing 1                        LS $1,000.00 $1,000.00 $2,830.00 $2,830.00 $3,270.00 $3,270.008Pavement Removal 42                      SYS $50.00 $2,100.00 $60.00 $2,520.00 $62.50 $2,625.009Guardrail, End Treatment, Remove 2                        EA $100.00 $200.00 $885.00 $1,770.00 $325.00 $650.0010Guardrail, Remove 120                    LFT $20.00 $2,400.00 $7.50 $900.00 $5.50 $660.0011HMA Patching, Type B, 825#/SYD 20                      TON $100.00 $2,000.00 $485.00 $9,700.00 $200.00 $4,000.0012Guardrail MGS W‐Beam, 6 FT 3 IN Spacing 31                      LFT $20.00 $625.00 $55.00 $1,718.75 $24.00 $750.0013Guardrail, MGS Tangent Terminal, SKT‐SP‐MGS, 50 FT 2                        EA $3,100.00 $6,200.00 $3,840.00 $7,680.00 $3,250.00 $6,500.0014Guardrail, Blockout, Composite, 6 IN x 8 IN x 1 FT 2 IN 15                      EA $25.00 $375.00 $35.00 $525.00 $28.50 $427.5015Mobilization and Demobilization for Seeding 1                        EA $500.00 $500.00 $160.00 $160.00 $325.00 $325.0016Mulched Seeding ‘U’ 80                      SYS $3.00 $240.00 $9.75 $780.00 $6.00 $480.0017Guardrail Reflector 18                      EA $25.00 $450.00 $25.00 $450.00 $12.50 $225.0018Topsoil, Undistributed 10                      CYS $50.00 $500.00 $125.00 $1,250.00 $425.00 $4,250.0019PVC Pipe Sleeve, Schedule 40, 8 IN Dia. 15                      LFT $25.00 $375.00 $30.00 $450.00 $82.50 $1,237.5020Railroad Coordination Allowance 1                        LS $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00DIVISION 4 TOTAL$48,770.00$62,883.75 $60,250.00Engineer's Estimate Northern Indiana Construction Specialties Company\\COSB‐FS1\Share\Public Works\Projects\Projects by Year\2018 Projects\118‐084 Guardrail Replacement and Installation\PROCUREMENT\BIDS AND AWARD\Bid Tabulation 118‐084 12152020.xlsx