Laserfiche WebLink
BID TABULATIONProject Name: Guardrail Replacement and InstallationProject No: 118‐084DIVISION 3Item No. Line ItemQuantity UnitUnit PriceCostUnit PriceCostUnit PriceCost1Construction Engineering 1 LS $2,000.00$2,000.00$975.00$975.00$1,200$1,200.002CPM Schedule 1 LS $1,000.00$1,000.00$245.00$245.00$600.00$600.003CPM Schedule, Monthly Update 4 EA $250.00$1,000.00$100.00$400.00$500.00$2,000.004Maintaining Traffic 1 LS $10,000.00$10,000.00$3,925.00$3,925.00$3,600.00$3,600.005Video Record 1 LS $500.00$500.00$200.00$200.00$450.00$450.006Mobilization and Demobilization 1 LS $1,075.00$1,075.00$4,130.00$4,130.00$7,800.00$7,800.007Guardrail, End Treatment, Remove 1 EA $100.00$100.00$885.00$885.00$325.00$325.008Guardrail, Remove 40 LFT $20.00$800.00$7.50$300.00$8.50$340.009Guardrail MGS W‐Beam, 6 FT 3 IN Spacing 81 LFT $20.00$1,625.00$44.00$3,575.00$22.00$1,787.5010Mobilization and Demobilization for Seeding 1 EA $500.00$500.00$160.00$160.00$325.00$325.0011Mulched Seeding ‘U’ 45 SYS $3.00$135.00$9.75$438.75$8.00$360.0012Guardrail Reflector 15 EA $25.00$375.00$25.00$375.00$12.50$187.5013Guardrail Terminal End Buffer 4 EA $800.00$3,200.00$605.00$2,420.00$125.00$500.0014Topsoil Undistributed 5 CYS $50.00$250.00$120.00$600.00$425.00$2,125.00DIVISION 3 TOTAL$22,560.00$18,628.75 $21,600.00Engineer's EstimateNorthern Indiana ConstructionSpecialties Company\\COSB‐FS1\Share\Public Works\Projects\Projects by Year\2018 Projects\118‐084 Guardrail Replacement and Installation\PROCUREMENT\BIDS AND AWARD\Bid Tabulation 118‐084 12152020.xlsx