BID TABULATIONProject NameProject No: Seitz Park ReconstructionBids Received November 24, 2020Division A Base BidItem No. Line Item Quantity UnitUnit Price Cost Unit Price Cost Unit Price CostA-1 Remediation Allowance1 LSUM$10,000.00 $10,000.00$10,000.00$10,000.00 $10,000.00 $10,000.00A-2 Maintenance of Traffic1 LSUM$8,500.00 $8,500.00 $6,432.10 $6,432.10 $3,661.00 $3,661.00A-3 Permit Compliance Administration 1 LSUM$5,000.00 $5,000.00$5,000.00$5,000.00 $5,000.00 $5,000.00A-4 Mobilization and Demobilization 1 LSUM$78,000.00 $78,000.00$110,476.93$110,476.93 $114,791.00 $114,791.00A-5 Construction Engineering1 LSUM$48,500.00 $48,500.00$12,590.30$12,590.30 $9,414.00 $9,414.00A-6 Video Record1 LSUM$2,500.00 $2,500.00$459.47$459.47 $1,569.00 $1,569.00A-7 Temporary Erosion and Sediment Control 1 LSUM$3,500.00 $3,500.00$2,901.67$2,901.67 $2,877.00 $2,877.00A-8 Temporary Drop Inlet Protection 1 EACH$300.00 $300.00$263.79$263.79 $262.00 $262.00A-9 Construction Access Drive1 EACH$5,000.00 $5,000.00$2,760.83$2,760.83 $2,092.00 $2,092.00A-10 Clearing, Right of Way1 LSUM$35,000.00 $35,000.00$1,582.73$1,582.73 $1,569.00 $1,569.00A-11 Sidewalk, Concrete, Removal481 SYS$20.00 $9,620.00$13.72$6,599.32 $13.60 $6,541.60A-12 Wall, Concrete, Removal65 LFT$150.00 $9,750.00$633.09$41,150.85 $627.60 $40,794.00A-13 Wall, Concrete, Partial Removal 225 LFT$100.00 $22,500.00$84.41$18,992.25 $83.68 $18,828.00A-14 Gabions, Remove and Salvage 190 CYS$55.00 $10,450.00$52.76$10,024.40 $52.30 $9,937.00A-15 Lighting Structure, Removal4 EACH$500.00 $2,000.00$390.93$1,563.72 $387.50 $1,550.00A-16 Excavation, Common1630 CYS$50.00 $81,500.00$52.76$85,998.80 $52.30 $85,249.00A-17 Borrow, B1249 CYS$60.00 $74,940.00$42.21$52,720.29 $41.85 $52,270.65A-18 Geofoam Lightweight Fill750 CYS$135.00 $101,250.00$167.13$125,347.50 $251.04 $188,280.00A-19 Pipe, Type 4, 6 in240 LFT$10.00 $2,400.00$26.38$6,331.20 $26.15 $6,276.00A-20 Aggregates for Underdrains9 CYS$150.00 $1,350.00$79.14$712.26 $78.56 $707.04A-21 Salvaged Gabion Material, Install 190 CYS$50.00 $9,500.00$52.76$10,024.40 $52.30 $9,937.00A-22 Concrete, C, Superstructure185 CYS$750.00 $138,750.00$391.77$72,477.45 $482.28 $89,221.80A-23 Concrete, B, Footings400 CYS$800.00 $320,000.00$581.37$232,548.00 $464.44 $185,776.00A-24 Concrete, A, Planter Wall12 CYS$1,100.00 $13,200.00$1,582.08$18,984.96 $960.59 $11,527.08A-25 Concrete Topping Slab, Integral Color, Finish "A" 237 SYS$110.00 $26,070.00$186.76$44,262.12 $74.28 $17,604.36A-26 Concrete Topping Slab, Integral Color, Finish "B" 231 SYS$95.00 $21,945.00$70.84$16,364.04 $74.27 $17,156.37A-27 Subgrade Treatment, Type III406 SYS$5.00 $2,030.00$76.09$30,892.54 $5.24 $2,127.44A-28 Compacted Aggregate, No. 53 90 TON$75.00 $6,750.00$63.31$5,697.90 $62.77 $5,649.30A-29 Sidewalk, 6-in116 SYS$90.00 $10,440.00$98.22$11,393.52 $120.52 $13,980.32A-30 Straight Curb84 LFT$30.00 $2,520.00$41.34$3,472.56 $35.93 $3,018.12A-31 Sidewalk, 6-in, Integral Color, Finish "A" 137 SYS$125.00 $17,125.00$140.26$19,215.62 $122.76 $16,818.12A-32 Sidewalk, 6-in, Integral Color, Finish "B" 24 SYS$90.00 $2,160.00$208.51$5,004.24 $128.59 $3,086.16A-33 Concrete Walk False Joints284 LFT$2.00 $568.00$1.24$352.16 $12.56 $3,567.04A-34 Expansion Joint, Concrete Walk 234 LFT$7.50 $1,755.00$6.48$1,516.32 $4.45 $1,041.30A-35 Sidewalk Joint Transitions104 LFT$10.00 $1,040.00$1.96$203.84 $2.52 $262.08A-36 Unit Paver38 SYS$175.00 $6,650.00$309.20$11,749.60 $236.43 $8,984.34A-37 Litter Receptacle1 EACH$1,620.00 $1,620.00$934.67$934.67 $1,630.00 $1,630.00A-38 Recycling Receptacle1 EACH$1,620.00 $1,620.00$934.67$934.67 $1,630.00 $1,630.00Engineer's EstimateLarson‐Danielson ConstuctionZiolkowskihttps://smithgroup4.sharepoint.com/sites/PRJ‐90597‐001/Shared Documents/001/CA/Bid/Bid Summary/2020‐1130 Seitz Bid Summary.xlsx