Laserfiche WebLink
REGULAR MEETING NOVEMBER 10, 2020 203 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — EAST BANK TRAIL STORM REPAIRS — PROJECT <br />NO. 118-306 (PO-0000248) <br />Mr. Gilot advised that Mr. Scott Kreeger, Engineering, has submitted Change Order No. 1 on <br />behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, indicating the <br />contract amount be decreased by $500 for a new contract sum, including this Change Order, in <br />the amount of $211,300. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— MIAMI BASIN CONTROL VALVE REPLACEMENT — PROJECT NO 116 082D (PO <br />0000306) <br />Mr. Gilot advised that Mr. Jacob Klosinski, Engineering, has submitted Change Order No. 1 <br />(Final) on behalf of HRP Construction Co., Inc., 5777 Cleveland Rd., South Bend, IN 46624, <br />indicating the contract amount be decreased by $740.52 for a new contract sum, including this <br />Change Order, of $175,259.48. Also submitted was the Project Completion Affidavit indicating <br />this new final cost of $175,259.48. Upon a motion made by Ms. Maradik, seconded by Mr. <br />Molnar and carried by roll call, Change Order No. 1 (Final) and the Project Completion Affidavit <br />were approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — SPEED HUMP INSTALLATION — <br />PROJECT NO. 120-043 (LRSA) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Premium Concrete Service, Inc., 712 Richmond St., Elkhart, IN 46516, for <br />the above referenced project, indicating a final cost of $210,400. Upon a motion made by Ms. <br />Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was <br />approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — BECK'S LAKE SITE — PROJECT NO 120-053 (PR-00005004) <br />In a memorandum to the Board, Mr. Finnan Cavanaugh, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Ms. Maradik, seconded <br />by Mr. Molnar and carried by roll call, the above request to advertise was approved, and the Title <br />Sheet was approved and signed. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — GUARDRAIL REPLACEMENT AND INSTALLATION — PROJECT NO. 118-084 <br />(PR-00004815) <br />In a memorandum to the Board, Mr. Finnan Cavanaugh, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Ms. Maradik, seconded by <br />Mr. Molnar and carried, the above request to advertise was approved, and the Title Sheet was <br />approved and signed. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — NORTH SHORE DRIVE BANK STABILIZATION — PROJECT NO 118-005A (PR <br />00005053 <br />In a memorandum to the Board, Alicia Czarnecki, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Also presented at this time for <br />approval and execution was the Title Sheet. Upon a motion made by Ms. Maradik, seconded by <br />Mr. Molnar and carried by roll call, the above request to advertise was approved, and the Title <br />Sheet was approved and signed. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF APPLICATIONS — <br />WATER WORKS UTILITY SERVICE LINE REPAIR PROGRAM <br />In a memorandum to the Board, Mr. Ken Smith, Utilities, requested permission to advertise for <br />the receipt of applications from qualified vendors for the preferred vendor list for repair of water <br />service line leaks between private residences and the public water main line. Therefore, upon a <br />