My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.E.(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
10-25-12 Packet
>
6.E.(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:14:28 PM
Creation date
10/22/2012 4:39:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 12, 2012 <br />Christopher B. Burke Engineering, LLC <br />220 West Colfax Avenue, Suite 500 <br />South Bend, IN 46601 <br />Attention: Mr. Jason Durr, PE <br />RE: R/W LAYOUT AND R/W ENGINEERING SERVICES FOR ERSKINE <br />CORRIDOR <br />Dear Mr. Durr: <br />Thank you for contacting Wightman Petrie regarding this project. Per your email request on <br />Wednesday, October 10, 2012 and our subsequent telephone conversation on Thursday, October <br />11, 2012, we are providing you with our estimate for performing the following tasks: <br />Staking of new Right -of -Way: This includes the two parcels located in the northeast <br />quadrant of Ireland Road and Miami Street, the two parcels located in the southeast <br />and southwest quadrants of Ireland Road and High Street and the parcel located in <br />the northwest quadrant of Ireland Road and Fellows Street ( Graber parcel). (Note: <br />The Graber parcel can be staked once the proposed right -of -way location has been <br />determined). Wooden stakes will be set at the proposed right -of -way locations and <br />paint marks will be made on hard surfaces, such as concrete or asphalt where <br />wooden stakes are not feasible. <br />Review the title commitments (furnished by you) for the above - mentioned parcels and <br />update the four parcel plats that have been prepared under a previous job no. Note. <br />The Graber parcel has not yet been prepared. It is understood that once this <br />proposed right -of -way location is approved, this parcel plat and legal description will <br />be prepared. <br />Prepare Area Computation sheets for the five parcels associated with this request. <br />The estimated fee for performing these services is $3,680.00 <br />WIGHTMANtEETRIE <br />ARCHIIECTURE GIS CIVIL ENGINEERING LANDSCAPE ARCHITECTURE <br />ENVIRONMENIAL PLANNING RENEWABLE ENERGY LAND SURVEYING <br />
The URL can be used to link to this page
Your browser does not support the video tag.