My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Laurel Woods Drainage Improvements Design – McCormick Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Laurel Woods Drainage Improvements Design – McCormick Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 7:16:03 PM
Creation date
11/24/2020 7:14:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A‐ Engineer’s Services <br />Laurel Woods Drainage Improvement Project ‐ Scope of Services <br />Page 14 of 15 <br />(Exhibit A‐ Engineer’s Services) <br />Notify the City if project elements appear to be in potential conflict with existing utilities along <br />the proposed storm sewer corridor to perform the Work. <br />At the consent of the City, meet with representatives of British Petroleum (BP) if the proposed <br />storm sewer appears to encroach on existing petroleum pipeline facilities along Auten Road. <br />Respond to comments or suggestions from the City on the extent of proposed Work. <br />Preliminary Design Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Prepare outline specifications, opinion of probable Construction Cost and other documents <br />outlined in Section A1.02 of the Contract. <br />Final Design Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Prepare final Drawings and Specifications and other documents outlined in Section A1.03 of <br />the Contract. <br />Bidding and Negotiating Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Assist Owner in the solicitation and negotiation of Bids outlined in Section A1.04 of the <br />Contract. <br />Construction Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Unless otherwise agreed by the Owner and Engineer, the Engineer services during the <br />Construction phase shall be limited to the work noted in Section A1.05.A of the Contract. <br />Post Construction Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Unless otherwise agreed by the Owner and Engineer, the Engineer services during the <br />Construction phase shall be limited to the work noted in Section A1.06 of the Contract. <br />Exclusions <br />This Contract does not include fees or provisions for Right‐of‐Way acquisition services. Further, the <br />Contract does not include fees or extensive submittal preparation services to the British Petroleum <br />Company. Such services would require an amendment to the Contract if needed.
The URL can be used to link to this page
Your browser does not support the video tag.