Laserfiche WebLink
Exhibit A- Engineer's Services <br />• Notify the City if project elements appear to be in potential conflict with existing utilities along <br />the proposed storm sewer corridor to perform the Work. <br />• At the consent of the City, meet with representatives of British Petroleum (BP) if the proposed <br />storm sewer appears to encroach on existing petroleum pipeline facilities along Auten Road. <br />• Respond to comments or suggestions from the City on the extent of proposed Work. <br />Preliminary Design Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Prepare outline specifications, opinion of probable Construction Cost and other documents <br />outlined in Section A1.02 of the Contract. <br />Final Design Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Prepare final Drawings and Specifications and other documents outlined in Section A1.03 of <br />the Contract. <br />Bidding and Negotiating Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Assist Owner in the solicitation and negotiation of Bids outlined in Section A1.04 of the <br />Contract. <br />Construction Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Unless otherwise agreed by the Owner and Engineer, the Engineer services during the <br />Construction phase shall be limited to the work noted in Section A1.05.A of the Contract. <br />Post Construction Phase <br />MCCORMICK will perform the following tasks in order to complete the noted work for both Prime <br />Contracts: Unless otherwise agreed by the Owner and Engineer, the Engineer services during the <br />Construction phase shall be limited to the work noted in Section A1.06 of the Contract. <br />Exclusions <br />This Contract does not include fees or provisions for Right -of -Way acquisition services. Further, the <br />Contract does not include fees or extensive submittal preparation services to the British Petroleum <br />Company. Such services would require an amendment to the Contract if needed. <br />Laurel Woods Drainage Improvement Project - Scope of Services <br />Page 14 of 15 <br />(Exhibit A- Engineer's Services) <br />