Laserfiche WebLink
CLIENT: 305 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 1 of 8No.Total Total Shts. Senior PM Survey Manager Project Surveyor Crew Chief Survey Tech CAD Tech Hours CostResearch Records for Plats & Deeds 22 4Obtain Existing Utility Information1 22 5Establish Existing R/W's1 1 12229Alignment and Centerline Contol1225Obtain Topographic Data1114411Establish Vertical Control Benchmarks1225Locate Existing Manholes, Inlets and Water Valves112Obtain Invert Elevations, Pipe Sizes and Directions112Locate existing Utilities in the R/W's1113Drafting (Utilities, Property Owners, Existing R/W)1146Total Hours241013131052Cost per Hour$160.00 $120.00 $120.00 $75.00 $65.00 $85.00Total Cost by Classification$320.00 $480.00 $1,200.00 $975.00 $845.00 $850.00Survey Total$4,670.00Budget$4,700.00APPENDIX "A-1"SurveyStaffhour JustifcationAbonmarche Consultants, Inc.City of South BendHoward Street Conceptual DesignPhase 2i - Howard Street and Eddy Street IntersectionOctober 27, 2020DESCRIPTIONSTAFFHOURS BY CLASSIFICATION